Lesson 8 of 9 · about 19 minutes
Codes, Standards and How Battery Fires Are Fought
You'll be able to
- Name the main battery safety standards and what each one does, with current editions as of October 2026
- Explain what Idaho's adopted 2018 IFC covers and where a county may need to require more
- Describe defensive firefighting for battery fires and why departments often let a unit burn
- Size an evacuation or shelter zone and estimate how many homes it reaches
Battery safety rules come in layers. A product standard says the equipment was built and tested a certain way. An installation standard says how it must be placed and protected. A fire code makes those enforceable in a jurisdiction. And a fire department's tactics decide what happens when all of that is not enough. A county that knows which layer is missing knows what to ask for.
The standards stack
| Document | What it does | Status as of October 2026 |
|---|---|---|
| UL 1973 | Safety standard for the batteries themselves in stationary use | Required for storage batteries by the 2018 IFC |
| UL 9540 | Safety standard used to list a complete energy storage system | Required for prepackaged and pre-engineered systems by the 2018 IFC |
| UL 9540A | Test method: how runaway starts and spreads cell to module to unit, and what gas comes out | 6th edition published March 13, 2026, formally adding large-scale fire testing |
| NFPA 855 | Installation standard for stationary storage: spacing, detection, suppression, explosion control, plans | 2026 edition, released September 2025; first edition was 2020 |
| International Fire Code | The enforceable code most U.S. jurisdictions adopt | 2021 and 2024 editions build NFPA 855 into Section 1207; Idaho enforces the 2018 edition statewide |
| NFPA 68 and NFPA 69 | Deflagration venting and explosion prevention | Referenced through IFC Section 911 in newer editions |
What changed in the 2026 NFPA 855
- A hazard mitigation analysis is now the default for most installations unless a technology chapter says otherwise, and removing the old maximum stored energy table means exceeding a threshold no longer lets a project skip it.
- Large-scale fire testing is required alongside UL 9540A, conducted or witnessed by an approved lab, to show whether a fire in one unit spreads to the next and to characterize the gas.
- Where cell or module tests release flammable gas, a unit-level test with intentional ignition of vent gas.
- Minimum requirements for an emergency response plan covering mitigation, preparedness, response and recovery, developed with the authority having jurisdiction, reviewed yearly, with yearly refresher training.
- Early fire detection may use smoke, thermal imaging or radiant energy detection.
What the 2021 and later IFC require
The 2021 IFC, as shown in California's 2022 fire code built on it, requires outdoor storage to be at least 10 feet from lot lines, public ways, buildings, stored combustibles and other exposures, and defines remote outdoor installations as those more than 100 feet from such exposures. It requires explosion control under Section 911 for rooms and walk-in units unless large-scale testing shows flammable gas is not released, commissioning and decommissioning plans, and a hazard mitigation analysis in listed situations. New York's version of the 2024 code carries the same 10-foot and 100-foot lines and notes they are based on the 2023 NFPA 855.
Idaho's code, and its gaps
Idaho Code 41-253 adopts the International Fire Code, 2000 edition, "and such later editions as may be so published and adopted by the state fire marshal," as the statewide minimum. IDAPA 18.08.01 carries the State Fire Marshal's amendments. The State Fire Marshal's codes page lists the 2018 IFC as the adopted edition. This course found no later statewide adoption as of October 2026.
For batteries, that edition leaves real gaps.
- Scope. The 2018 IFC's Section 1206.1 describes energy storage systems "designed to provide electrical power to a building or facility," such as standby power and load shedding. A standalone grid battery that exports to the grid does not fit that description neatly. How the code applies is the fire code official's call.
- Utility exclusion. Section 1201.1 says Chapter 12 does not apply to generation, transmission and distribution equipment under the exclusive control of an electric utility. Whether a utility-owned battery at a substation falls in that exclusion is again a question for the fire code official, and worth asking about in writing.
- Older numbers. The 2018 edition sets 5 feet of outdoor separation from lot lines, public ways and buildings (10 feet from means of egress), has no remote-installation category, and has no Section 911 explosion control requirement for batteries. It does require UL 9540 listing for prepackaged systems, an energy management system with alarms, and a hazard mitigation analysis in specific cases.
A county is not stuck with the minimum. Idaho Code 67-6512(d) lets a county attach conditions to a special use permit, including "requiring more restrictive standards than those generally required in an ordinance," and 67-6512(e) lets it require studies of a project's effects before granting the permit. Requiring compliance with the 2026 NFPA 855, a UL 9540A and large-scale fire test report for the exact product, and written fire district approval of the emergency response plan are common conditions. The fire and battery safety lesson in the energy siting course shows how to write them, and the conditional uses lesson covers the permit process.
States are moving too. California's SB 283, signed in October 2025 and effective January 1, 2026, requires developers to consult local fire authorities on design, risk and emergency plans before applying, and requires a fire safety inspection, paid by the owner, before a facility can operate.
How battery fires are fought
Battery fires flipped some old firefighting habits. UL FSRI's report on the 2019 Arizona explosion recommended hazmat training focused on storage systems, remotely accessible gas monitoring, explosion prevention and full-scale testing to find the safest tactics. Since then, the record in EPRI's database shows a fairly consistent playbook.
| Tactic | What it means | Where it was used |
|---|---|---|
| Monitor and contain, or let it burn | Keep people back, let the affected unit burn out, watch for spread | Moss Landing 2025; Melba, Idaho 2023; Parkfield 2025; Peoria, Ariz. 2025 |
| Cool the exposures | Spray water on neighboring units and structures, not into the burning one | Peoria 2025 cooled adjacent Megapacks; Tilbury 2025 used a water curtain |
| Remote eyes | Drones, robots and thermal cameras instead of people near the box | Gateway 2024 used a drone and a robot; Tilbury used drones and thermal imaging |
| Read gas before entry | Measure hydrogen and other gases; keep doors shut until clear | Gateway's 600-foot barrier stayed while hydrogen was high |
| Draw down charge | Lower state of charge across the site after an incident | Warwick, N.Y., Dec. 2025, cut SOC to 50% |
| Reignition watch | Stay or hand off to a site crew for days or weeks | Gateway, about 17 days; Moss Landing keeps a 24-hour private fire crew during cleanup (EPA) |
Water is used to cool and to protect exposures, and sometimes, inside buildings, through sprinkler systems; Gateway's response pumped water into the building's suppression system, per EPRI's event page. Every gallon that touches burning batteries can carry contaminants, which lesson 9 covers.
Letting a unit burn is a trade. It keeps firefighters out of the blast zone, which is where people have been hurt and killed. It also means smoke for hours or days. Residents near Moss Landing and Melba lived through exactly that, and most neighbors mean that experience when they talk about battery risk.
Evacuation and shelter orders
| Incident | Order |
|---|---|
| Gateway, Otay Mesa, May 2024 | 600-foot safety barrier; shelter order and evacuation warning |
| Escondido, Sept. 2024 | Evacuation within about a quarter mile; shelter in place farther east |
| Moss Landing cleanup fire, Sept. 2026 | Shelter in place within one-third mile, from the morning until about 4:15 p.m. |
| Chaumont, N.Y., July 2023 | Shelter in place within 1 mile |
| Parkfield, Aug. 2025 | Five homes within a 2-mile radius evacuated |
| Summerside, P.E.I., Sept. 2026 | Voluntary evacuation within 500 meters, shelter instructions, school closures |
Worked example: who is inside the circle
An invented battery site near Juniper Gap sits in farm country with about 40 homes per square mile. Area of a circle = pi x radius squared; one square mile = 640 acres = 5,280 feet on a side.
Radius Square miles Homes at 40/sq mi
600 ft pi x (600/5,280)^2 = 0.041 about 2
1/4 mile pi x 0.25^2 = 0.196 about 8
1/3 mile pi x 0.333^2 = 0.349 about 14
1 mile pi x 1^2 = 3.14 about 126
2 miles pi x 2^2 = 12.6 about 503
1/4 mile in acres: 0.196 x 640 = about 126 acres
Doubling the radius quadruples the area. A plan that names a 1-mile shelter zone has to reach about 16 times as many people as one that names a quarter mile. Ask which radius the emergency plan uses, why, and how each household inside it will be told.
Common mix-ups
- Claim: Enough water puts out any battery fire. What the evidence shows: Departments mostly use water to cool neighbors and exposures; cells in runaway keep producing heat and gas.
- Claim: Letting it burn means the fire department gave up. What the evidence shows: It is a deliberate tactic to keep responders away from explosion risk, recommended in investigations since 2019.
- Claim: If the state fire code covers batteries, the county has nothing to add. What the evidence shows: Idaho's 2018 code predates NFPA 855's large-scale testing and remote-installation rules, and may not reach utility-controlled equipment. Counties can require more through permit conditions.
Reporting angle
- Ask the fire code official, in writing, which code edition and sections apply to the project, whether any part falls under the utility exclusion in IFC 1201.1, and who signs off.
- Request the UL 9540 listing, the UL 9540A and large-scale fire test reports, the hazard mitigation analysis and the emergency response plan from the county or fire district.
- Ask the fire chief on the record: training received, by whom, at whose cost; water supply on site; equipment for gas monitoring; and the plan for evacuation radius and notification.
- Watch the county planning and zoning commission and board agendas for the special use permit hearing; the Idaho Open-Meetings Compliance Tracker helps log notice and agenda compliance.
- Check the State Fire Marshal's page and the administrative bulletin for any new IFC adoption.
Research angle
- Idaho adoption: Idaho Code 41-253, IDAPA 18.08.01 and the State Fire Marshal codes page.
- Code text: 2018 IFC Chapter 12 and the 2021-based Section 1207.
- NFPA 855 2026 changes: MeyerFire and Energy-Storage.news.
- Firefighter lessons: UL FSRI Arizona report.
- Permit conditions authority: Idaho Code 67-6512.
Check yourself
1. What is UL 9540A?
UL 9540A is the test method; its 6th edition, published March 13, 2026, formally incorporates large-scale fire testing. UL 9540 is the safety standard used to list the whole system.
2. Which edition of the International Fire Code does Idaho's State Fire Marshal list as adopted statewide?
The State Fire Marshal's codes page lists the 2018 IFC as the adopted edition, under authority in Idaho Code 41-253, which lets the fire marshal adopt editions later than 2000.
3. The 2018 IFC's Chapter 12 scope excludes which equipment?
Section 1201.1 says the chapter does not apply to energy installations under the exclusive control of an electric utility or lawfully designated agency.
4. Under the 2021 and later IFC (based on NFPA 855), outdoor energy storage must be at least how far from lot lines, public ways and buildings, and what counts as remote?
Section 1207.8.3 requires 10 feet of clearance; remote outdoor installations are more than 100 feet from those exposures. The 2018 IFC required 5 feet.
5. Why do fire departments often let a burning battery container burn out?
Defensive tactics, like cooling adjacent units with water as at Peoria in 2025, reduce risk to firefighters; the cost is a longer fire and more smoke.
6. An evacuation zone has a radius of one-quarter mile. About how many acres does it cover?
Area = pi x 0.25 squared = about 0.196 square miles; x 640 acres per square mile = about 126 acres.
Terms in this lesson
- UL 9540
- The safety standard used to list (certify) a complete energy storage system.
- UL 9540A
- The test method for thermal runaway fire propagation at cell, module, unit and installation level.
- NFPA 855
- The National Fire Protection Association's standard for installing stationary energy storage systems; 2026 edition released September 2025.
- The official or agency that enforces a code locally, usually the fire marshal or fire chief for fire code matters.
- Hazard mitigation analysis (HMA)
- An engineering analysis of how a system can fail and how the design limits the consequences; the default for most systems in the 2026 NFPA 855.
- Defensive firefighting
- Tactics that protect surrounding exposures and people from a safe distance instead of attacking the fire directly.
Sources
- Idaho Department of Insurance, State Fire Marshal, Statutes, Rules, Codes and Standards (2018 IFC listed as adopted edition) checked 2026-10
- Idaho Code 41-253, Statement of purpose, adoption of international fire code checked 2026-10
- IDAPA 18.08.01, Adoption of the International Fire Code (current rule) checked 2026-10
- 2018 International Fire Code as adopted in Idaho, Chapter 12 (UpCodes viewer) checked 2026-10
- 2022 California Fire Code (based on the 2021 IFC), Section 1207 Electrical Energy Storage Systems (UpCodes viewer) checked 2026-10
- 2024 International Fire Code as amended in New York, Section 1207 (UpCodes viewer) checked 2026-10
- MeyerFire, What's new in NFPA 855, 2026 edition (Sept. 2025) checked 2026-10
- Energy-Storage.news, NFPA 855: 2026 edition updates and what they mean for energy storage projects (Apr. 29, 2026) checked 2026-10
- IndustryWeek (sponsored by CSA Group), What the 6th Edition of UL 9540A Means for Battery Storage Safety Certification (2026) checked 2026-10
- UL FSRI, Report: Four Firefighters Injured in Lithium-Ion Battery Energy Storage System Explosion, Arizona (July 2020) checked 2026-10
- Solar Power World, California passes battery storage safety standards after Moss Landing fire (Oct. 14, 2025), on SB 283 checked 2026-10
- EPRI, BESS Failure Incident Database (stationary storage table) checked 2026-10
- U.S. EPA, Moss Landing Vistra battery fire updates (Sept. 18, 2026 entry) checked 2026-10
- Idaho Code 67-6512, Special use permits, conditions, and procedures checked 2026-10