Lesson 3 of 9 · about 17 minutes
Water: Cooling, Aquifers and Reclaimed Supply
You'll be able to
- Explain the difference between evaporative cooling, closed-loop cooling and air cooling
- Convert a WUE figure in liters per kWh into gallons per MWh and gallons per day
- Tell direct water use from indirect water use at power plants
- Cite real reported examples, from about 10,000 gallons a year to about 1 billion
Servers turn electricity into heat. Every kilowatt that goes in comes out as warmth that has to be carried away, and the cheapest way to carry heat in most climates is to evaporate water. So data center water use is mostly a cooling choice. The same building can use a lot of water or almost none, depending on design, climate and what the operator decided to trade off.
How cooling works
| Method | How it works | Water on site | Electricity |
|---|---|---|---|
| Evaporative (cooling towers, adiabatic coolers) | Water evaporates and carries heat away. Some water is also flushed to control mineral buildup. | High | Lower |
| Closed-loop with dry coolers or chillers | Coolant circulates in sealed pipes. Fans and refrigeration reject heat to the air. | Low after initial fill | Higher, worst on hot days |
| Outside-air economizer | Filtered outdoor air cools the room when it is cool enough outside. | Low (sometimes misting on hot days) | Low in cool climates |
Most real sites mix these. A campus may run on outside air in winter and switch to evaporative assist in July. Meta told the public its Kuna, Idaho data center would average about 70,000 gallons a day, roughly 80 percent below industry norms, mostly by using winter air cooling, according to the Idaho Conservation League. That is an average. The July number will be higher.
Liquid cooling for AI chips, where coolant runs to cold plates on the processors, is often described as water-saving. Inside the building it is a closed loop. But the heat still has to leave the building, and the final step can be a cooling tower or a dry cooler. Ask about that last step.
The national numbers
LBNL's 2024 report estimated US data centers directly consumed about 17 billion gallons of water in 2023, as reported by the Conversation and Latitude Media. It also estimated a much larger indirect footprint, around 211 billion gallons, from water evaporated at the power plants that supplied the electricity. Direct use could double or quadruple by 2028 under its scenarios.
For scale: 17 billion gallons a year is about 47 million gallons a day across the whole country. A single mid-size city can use that. The national total is not huge. The local total can be, which is why the whole debate is about specific aquifers and specific water systems.
WUE and the gallons math
Water usage effectiveness is liters of site water divided by kilowatt-hours of IT energy. Reported figures cover a wide range, as of October 2026:
- Industry average often cited: about 1.8 L/kWh (TechTarget, July 2025, which gives no underlying source).
- AWS fleet claim: 0.15 L/kWh.
- Microsoft global average: 0.30 L/kWh, down from 0.49 in 2021.
- Microsoft Arizona sites: 1.52 L/kWh.
Company fleet averages blend cool and hot sites. Do not apply a fleet number to a desert site.
Example: converting WUE into gallons
Step one, units. 1 L/kWh = 1,000 L/MWh. One gallon is 3.785 liters. So 1 L/kWh is about 264 gallons per MWh.
| WUE (L/kWh) | Gallons per MWh |
|---|---|
| 0.15 | about 40 |
| 0.30 | about 79 |
| 1.52 | about 402 |
| 1.8 | about 475 |
Step two, apply to a campus. Use the 100 MW campus from the first lesson, at 700,800 MWh a year. Strictly, WUE divides by IT energy only, which is smaller than facility energy, so this example overstates water slightly. Treat it as a ceiling.
- At 1.8 L/kWh: 700,800,000 kWh x 1.8 = 1.26 billion liters, or about 333 million gallons a year. Divide by 365: about 913,000 gallons a day.
- At 0.15 L/kWh: about 27.8 million gallons a year, or about 76,000 gallons a day.
Step three, compare. EPA WaterSense says the average American family uses more than 300 gallons a day at home. 913,000 / 300 is about 3,000 families. 76,000 / 300 is about 250 families. Same building size, twelvefold difference, all from the cooling design.
Real reported examples
| Site or company | Reported water | Note |
|---|---|---|
| Google, Council Bluffs, Iowa (2024) | about 1 billion gallons | Google's highest site that year |
| Google, Storey County, Nevada (2024) | about 1.5 million gallons | Air-cooled |
| Google, Pflugerville, Texas (2024) | about 10,000 gallons | Air-cooled |
| Google, all operations (2023) | 6.4 billion gallons, about 95% at data centers | Company report |
| Meta, all operations (2023) | 813 million gallons, about 95% at data centers | Company report |
| Meta, Kuna, Idaho | about 70,000 gallons a day, average (projected) | Company figure via ICL |
| Microsoft, Mt. Pleasant, Wisconsin | about 350,000 gallons on peak day (projected) | Closed-loop design; TechTarget figure, no source given |
Amazon's sustainability reports do not disclose how much water the company uses (it publishes the fleet WUE above instead), and Microsoft reports operations as a whole rather than data centers separately, according to the University of Wisconsin-Milwaukee researchers Peyton McCauley and Melissa Scanlan. Disclosure is voluntary in most states. That gap is worth pressing on: ask the company and the local water provider for site-level numbers.
Virginia's JLARC found in 2024 that most data centers there use about as much water as a large office building or less, while a few use a great deal more. An October 2026 opinion piece in Cardinal News by independent researcher Tommy Turner reported that a Virginia DEQ simulation of a 3-million-gallon-a-day withdrawal for an evaporative hyperscale campus failed permitting criteria at all nine coastal plain locations tested. His link for that goes to his own site, not a DEQ document, so ask DEQ for the simulation before you repeat it. Both findings can hold at once. Averages are modest; the outliers are what break aquifers.
Idaho's 2026 cooling-water law
In 2026 the Idaho Legislature passed House Bill 895, which added Idaho Code 42-252. Data centers, as the tax code defines them, that begin construction on or after July 1, 2026 may not use water for cooling as a consumptive use unless the water comes from a municipal, water district, or water and sewer district system. The bill's findings tell the director of the Department of Water Resources to treat data center water use as conflicting with the local public interest when weighing permits and transfers. For a new Idaho project, that means a well and a water right purchase no longer settle the cooling question; the water has to come through a public system, and the course on Data Center Planning Issues follows what that does to siting.
Aquifers, peaks and reclaimed water
A March 2026 paper by Yuelin Han, Pengfei Li, Adam Wierman and Shaolei Ren argues that peak-day demand is the real constraint on public water systems. Cities size wells, treatment plants and pipes for the hottest day, which is also when evaporative cooling peaks. Their estimate: at 2024 water intensity, US data centers could need 697 to 1,451 million gallons a day of new water capacity through 2030, roughly New York City's average daily supply. If water intensity instead falls 10 percent a year, their range drops to 227 to 604 million gallons a day. They also note the trade-off: water limits push operators toward dry cooling, which raises electricity demand on summer peaks.
In much of the West, groundwater is governed by water rights and the prior appropriation doctrine. A new user needs a right, a transfer or a contract with a city that has one. Ask which.
Reclaimed water is the usual answer to "you will drain our wells." Tucson's Project Blue proposal, tied to Amazon Web Services and developed by Beale Infrastructure, planned to use drinking water for at least two years and then switch to reclaimed water once a new line was built. The Tucson City Council rejected the annexation and water deal unanimously in August 2025. The developer returned with a design that cools with electricity, needing 287 MW from Tucson Electric Power by 2028, according to KJZZ. Water fight became power fight.
In Idaho, the unpassed 2026 House Bill 609 would have required future recipients of the data center sales tax break to notify the local water provider in writing before construction began. It shows how lawmakers have tried to tie incentives to water disclosure.
Common mix-ups
- Claim: Every data center drinks millions of gallons a day. What the evidence shows: Reported sites range from about 10,000 gallons a year to about 1 billion. Cooling design and climate drive the spread.
- Claim: Closed-loop means zero water. What the evidence shows: The loop needs an initial fill and top-ups, and the indirect water at power plants still counts. Dry cooling also raises power use.
- Claim: Water evaporated is "returned" to the local supply. What the evidence shows: Evaporated water leaves the basin as vapor. That is why consumption matters more than withdrawal for aquifers.
Reporting angle
- Ask for average-day and peak-day water use in writing, plus the cooling design and the WUE assumption.
- Request the will-serve letter or water service agreement from the city or water district.
- Check the state water resources agency for new water right applications or transfers at the parcel.
- Ask whether reclaimed water is available now or depends on a pipeline not yet funded.
- Get annual water use reported to the city after operation starts, and compare to the promise.
Research angle
- Latitude Media on the water footprint: How power generation adds to a site's water use.
- Small Bottle, Big Pipe (arXiv): Han, Li, Wierman and Ren on water per query.
- Idaho Code 42-252: Water statute as amended in 2026.
- Idaho H0609 (2026) text: Bill text.
- EPA WaterSense: Household water use benchmarks.
- JLARC Data Centers in Virginia: Virginia's state audit of the industry.
- DCD on Tucson and Project Blue: Trade coverage of the rejection.
Check yourself
1. LBNL estimated US data centers directly consumed about how much water in 2023?
LBNL's figure for direct consumption in 2023 was about 17 billion gallons, with indirect use at power plants estimated at around 211 billion gallons.
2. A WUE of 1.8 liters per kWh equals about how many gallons per MWh?
1.8 L/kWh is 1,800 L/MWh. Divide by 3.785 liters per gallon: about 475 gallons per MWh.
3. Which cooling approach uses the least water on site but usually more electricity on hot days?
Dry cooling moves heat with fans and coils instead of evaporation, so it uses little water but more power, especially in heat.
4. Google reported its Council Bluffs, Iowa data centers used about how much water in 2024?
Council Bluffs used about 1 billion gallons, the most of any Google site that year. Air-cooled Pflugerville, Texas used about 10,000 gallons.
5. Why does peak-day water use matter more to a small city water system than annual averages?
Han, Li, Wierman and Ren (2026) stress that peak withdrawals on hot days strain public systems, since capacity is built for peaks.
6. What did the Tucson Project Blue proposal plan to use for cooling after its first two years, according to Data Center Dynamics?
It planned potable water at first, then reclaimed water once a new line was built. The city rejected the plan in August 2025.
Terms in this lesson
- Evaporative cooling
- Cooling that removes heat by evaporating water, usually in cooling towers. Efficient on power, heavy on water.
- Closed-loop cooling
- A sealed system that circulates the same coolant, rejecting heat through dry coolers or chillers instead of evaporation.
- Water usage effectiveness (WUE)
- Site water used in liters divided by IT energy in kilowatt-hours. Lower is better.
- Withdrawal vs consumption
- Withdrawal is water taken from a source. Consumption is the part that is evaporated or otherwise not returned.
- Reclaimed water
- Treated municipal wastewater reused for non-drinking purposes such as cooling or irrigation.
Sources
- The Conversation via The Invading Sea, Data centers consume massive amounts of water (McCauley and Scanlan, Sept. 2025) checked 2026-10
- Latitude Media, Data centers' hidden water footprint is linked to the grid checked 2026-10
- TechTarget, How do data centers use and manage water? (Roundy, July 2025) checked 2026-10
- Han, Li, Wierman, Ren, Small Bottle, Big Pipe (arXiv 2603.02705, March 2026) checked 2026-10
- Idaho Conservation League, The Dark Side of Data Centers, Part 3 checked 2026-10
- Data Center Dynamics, Residents cheer as Tucson rejects Amazon's Project Blue (Aug. 2025) checked 2026-10
- KJZZ, Pima County residents ask supervisors to stop latest Project Blue proposal (Oct. 22, 2025) checked 2026-10
- JLARC, Data Centers in Virginia (2024) checked 2026-10
- Cardinal News, Researcher: The data center jobs are real (Turner, Oct. 5, 2026) checked 2026-10
- EPA WaterSense, How We Use Water checked 2026-10
- Idaho Legislature, H0609 (2026) bill text checked 2026-10
- Idaho Code 42-252 (2026, House Bill 895) checked 2026-10