Lesson 4 of 9 · about 15 minutes
Inside the Building: White Space, Racks, Servers and GPUs
You'll be able to
- Tell white space from gray space and name what lives in each
- Describe what is in a rack and how a rack's power is measured
- Explain why AI racks draw ten to twenty times more than ordinary racks
- Compute a hall's power needs from rack counts and densities
Walk into the main hall of a data center and the first thing you notice is the noise: thousands of fans pushing air, a steady roar that makes conversation hard. The second thing is the order. Rows of identical black cabinets, cables bundled in trays overhead, painted lines on the floor. This room is the white space, where IT equipment lives. Everything that supports it, the switchgear, batteries, chillers and generators, sits in gray space: back rooms, mechanical galleries, rooftops and yards. In a big modern campus the gray space can take as much land as the white space.
The rack
A rack is a standard steel frame 19 inches wide inside, usually 42 to 48 rack units tall. One rack unit, written 1U, is 1.75 inches. A typical general-purpose server is 1U or 2U, so a rack might hold 20 to 40 servers plus a network switch at the top and two power strips (called PDUs, power distribution units) running down the back. Two power strips fed from separate electrical paths let a server keep running if one path fails.
The number that matters most is rack density: how many kilowatts a rack draws. Uptime Institute's 2025 survey put the average typical rack at almost 9 kW, up from 8.3 kW in 2024. About three quarters of operators said their typical rack runs under 10 kW. Only a few percent typically run 30 kW or more, though the share with at least some racks above 30 kW is growing.
What goes in the racks
- General-purpose servers. Each has one or two CPUs, memory and local drives. They run websites, databases, email and business software. A typical one draws a few hundred watts to about a kilowatt.
- GPU servers. Packed with accelerator chips. Nvidia's H100 SXM chip is rated up to 700 W on its own. A common eight-GPU server draws around 10 kW, about what a whole rack of ordinary servers used to.
- Storage. Arrays of hard drives and flash drives that hold the data. Hard drives still store most of the world's bulk data because they are cheap per terabyte; flash handles the fast work.
- Network gear. Switches at the top of each rack connect to bigger switches at the end of each row and in a central core. AI clusters add a second, much faster network just for GPU-to-GPU traffic.
Why AI racks are so hot
AI training splits one huge job across thousands of GPUs that trade results constantly. The shorter the cables between them, the faster they can talk, so chip makers have pushed to put as many GPUs as possible in one rack. Nvidia's GB200 NVL72 joins 72 Blackwell GPUs and 36 Grace CPUs in one liquid-cooled rack. Industry estimates put racks in this family at well over 100 kW. Integrator 2CRSi lists the newer GB300 NVL72 at about 135 to 140 kW and Vera Rubin NVL72 racks at roughly 190 to 230 kW, with 600 kW racks on Nvidia's roadmap for 2027. Vendor figures depend on configuration, so quote them as approximate.
| Era or rack type | Typical power per rack | Cooling |
|---|---|---|
| Enterprise rack, around 2010 | About 3 to 5 kW | Room air |
| Average rack, Uptime 2025 survey | Almost 9 kW | Mostly air |
| Dense cloud or early GPU rack | 15 to 40 kW | Air with containment, sometimes rear-door coolers |
| Nvidia GB300 NVL72 class | About 135 to 140 kW | About 90 percent direct liquid |
| Nvidia Vera Rubin NVL72 class | About 190 to 230 kW | Fully direct liquid |
| Announced roadmap | 600 kW and up | Liquid, with new power designs |
Worked example: same room, two worlds
The invented Pine Hollow data hall has room for 400 racks.
- Fill it with average racks at 8 kW: 400 times 8 = 3,200 kW = 3.2 MW of IT load.
- Fill it with AI racks at 130 kW: 400 times 130 = 52,000 kW = 52 MW.
- Ratio: 52 divided by 3.2 = about 16 times the power in the same floor area.
Now add cooling and losses. If the facility's PUE (lesson 7) is 1.3, the AI hall draws 52 times 1.3 = 67.6 MW from the grid. Run it all year at 80 percent: 67.6 times 8,760 hours times 0.8 = about 474,000 MWh, or 474 GWh. One room. That is why older buildings often cannot host AI: their electric service and cooling were sized for the first number.
The network inside the hall
Ordinary cloud halls use a layered network: a switch at the top of each rack, links up to bigger switches serving a row or a pod, and a core that connects pods to each other and to the outside world. Copper cables handle the short runs inside a rack. Fiber takes over for anything longer than a few meters. A large building can hold tens of thousands of fiber strands in overhead trays.
AI halls add a second network just for GPUs. Inside an NVL72 rack, the GPUs talk over Nvidia's NVLink connections, which act like one giant switchboard. Between racks, clusters use very fast Ethernet or InfiniBand links, often 400 or 800 gigabits per second per port, wired so that any GPU can reach any other in a few hops. That second network can cost as much as a meaningful share of the cluster and draws its own power. It is also why AI training wants every GPU in one building or one campus: stretch those links across a state and the chips spend their time waiting.
Storage sits on its own network too. Training jobs read huge datasets and save checkpoints, snapshots of the model's progress, every so often, so that a failed chip does not mean starting over. A single checkpoint for a very large model can run to terabytes.
Weight is a problem too. A loaded AI rack can weigh well over a ton, more than many older raised floors were built to carry. New AI halls often put racks directly on a reinforced slab and run power and cooling pipes overhead.
Common mix-ups
- Claim: Data centers mostly store data. What the evidence shows: Storage is part of it, but most of the power goes to computing: servers and accelerators doing work, plus the cooling that removes their heat.
- Claim: Chips keep getting more efficient, so power use should fall. What the evidence shows: Work done per watt has improved a lot, but demand for that work has grown faster. Efficiency gains have gone into doing more work.
Reporting angle
When a developer says a building is "AI ready," ask what rack density it is designed for and whether it has liquid cooling to the rack. A building designed for 10 to 15 kW racks is ordinary cloud or colocation. One designed for 100 kW and up is an AI facility, with a higher electric service request and a different cooling plant. Ask also how many racks or what IT megawatts the building holds at full build-out, so you can check the math against the utility request.
Research angle
- Uptime Global Survey 2025 report: Rack density, PUE history and staffing findings.
- Nvidia GB200 NVL72: Vendor specifications for a liquid-cooled rack.
- Nvidia H100 specifications: Vendor power and performance specs.
- 2CRSi power and cooling guide: Rack power and cooling by chip generation.
- Upsite on rack density trends: Summary of Uptime 2024 density and PUE data.
Check yourself
1. What is 'white space' in a data center?
White space holds IT equipment. Gray space holds the power and cooling gear that supports it.
2. Uptime Institute's 2025 survey put the average typical rack density at about what level?
The 2025 survey reported an average modal density of almost 9 kW, up from 8.3 kW. Most racks are still under 10 kW, even as AI racks climb far higher.
3. An Nvidia GB200 NVL72 rack holds how many GPUs?
The NVL72 name gives it away: 72 Blackwell GPUs and 36 Grace CPUs in one liquid-cooled rack.
4. A hall has 400 racks at 8 kW each. What is its IT load?
400 times 8 kW = 3,200 kW, which is 3.2 MW.
5. Why do AI GPUs need such fast networking between servers?
Training a big model is one giant calculation spread across many chips. They trade partial results all the time, so slow links leave expensive GPUs waiting.
Terms in this lesson
- White space
- The floor area of a data center that holds IT equipment.
- Gray space
- The rooms and yards that hold power and cooling equipment supporting the IT.
- Rack
- A standard metal frame, usually 42 to 48 units tall, that holds servers and other gear. One rack unit (1U) is 1.75 inches.
- Rack density
- How much electric power one rack draws, measured in kilowatts.
- GPU
- Graphics processing unit: a chip with thousands of small cores that does the parallel math behind AI.
- Thermal design power (TDP)
- The maximum heat a chip is designed to produce, in watts, which the cooling system must remove.
Sources
- Uptime Institute Global Data Center Survey 2025 (report PDF) checked 2026-10
- Nvidia: GB200 NVL72 checked 2026-10
- Nvidia: H100 Tensor Core GPU specifications checked 2026-10
- 2CRSi: Nvidia from Blackwell to Rubin, power and cooling guide checked 2026-10
- Upsite Technologies: Rack density rises while PUE and outage frequency remain flat (Uptime 2024 data) checked 2026-10