Lesson 2 of 9 · about 15 minutes
Comprehensive Plan Language That Holds Up
You'll be able to
- Name the 67-6508 plan components that bear on energy siting
- Tell the difference between plan language that gives zoning a foundation and language that only sounds strong
- Quote HCR 32 and the Agricultural Protection Area Act accurately
- Lay out the notice and hearing steps for a plan amendment under 67-6509
The comprehensive plan is where a county says what it is for. Zoning then has to follow it. In energy fights, the plan is usually the document both sides quote at the hearing, and the side with the plan's actual words on its side tends to win the consistency argument. The planning course covers how plans work in general in its comprehensive plan lesson. This lesson is about writing energy policy into one.
The components that carry energy policy
Idaho Code 67-6508 lists the subjects a plan must address unless it explains why one is not needed. These touch energy siting directly.
| Component | What the statute says it covers | Energy policy that belongs there |
|---|---|---|
| (a) Property rights | An analysis so policies and conditions do not violate private property rights or adversely affect values | The county's reasoning on non-participating neighbors' property and on the limits of a leasing owner's rights |
| (e) Land use | The "intrinsic suitability of lands" for agriculture, industry and other uses, with a map | A map of where industrial energy use is suitable, conditional or unsuitable |
| (f) Natural resources | Uses of waters, range, soils, wildlife, watersheds | Soil capability classes, rangeland and sage habitat, canyon rims and basalt landforms |
| (h) Public services, facilities and utilities | Includes "power plant sites, utility transmission corridors" | Where generation and lines may go, and what the county expects of them |
| (n) Agriculture | Agricultural lands, farming activities, farm businesses and agriculture's role | The farm economy's dependence on irrigated ground; conversion limits |
| (p) National interest electric transmission corridors | After PUC notice, analysis of high-voltage routes (115 kV or more on structures 40 feet or taller) | Preferred and opposed corridors, co-location with existing lines |
| (r) Groundwater | The board must consider effects on source, quantity and quality of groundwater | Water use by facilities and the large loads they serve; protection of wells and canals |
Jeff's package put its energy policy in the utilities chapter. That works, but cross-reference it from the land use, agriculture and natural resources chapters, so no one can claim the plan contradicts itself.
Strong-sounding versus load-bearing
A plan sentence is load-bearing if a board can apply it to a specific application and reach a yes or no. Compare:
Example: rewriting Owlcreek County's energy policy
Before (typical): The County supports balanced renewable energy development that respects agriculture and rural character.
After (load-bearing), adapted from Jeff's utilities chapter:
- Commercial energy generation, storage and substation facilities are industrial uses. The County directs them away from irrigated cropland and toward land unsuitable for farming: shallow stony soils over bedrock, saline flats, previously disturbed or industrial sites.
- Land in USDA NRCS Land Capability Class I and II is not suitable for commercial energy facilities. No variance or waiver should authorize one.
- Small on-site systems that serve a farm, home or business on the same parcel are appropriate in every zone and should be permitted administratively.
- Larger facilities should face review that increases with size, including objective standards, financial assurance and expanded public notice.
- All review, study, infrastructure and decommissioning costs created by an energy application are borne by the applicant.
- The County will consider the combined effect of approved, pending and reasonably foreseeable projects, not each project alone.
Each numbered sentence becomes a zoning provision in later lessons: siting priority becomes districts, soils become a prohibition, small systems become Tier 1, scaled review becomes tiers, costs become fees and bonds, cumulative effect becomes a cap.
Notice what the rewrite leaves out. Jeff's draft also directed large projects toward "desert areas existing on BLM grounds," while his own rebuttal to the county planning commission argued that basalt fields and sagebrush are irreplaceable too. That tension hands an opponent an easy line. The cleaner position, and the one this course takes, is the one he lands on: developers must show they can site a project without irreversibly harming either farmland or intact public land, and already-disturbed sites come first.
Quoting state policy accurately
Plans often cite the Legislature. Get it right.
HCR 32 (2026). A House concurrent resolution on "state energy sovereignty." It passed the House on March 16, 2026 and the Senate on March 25, both by voice vote, and went to the Secretary of State on March 27. Its findings mention the Eastern Snake River Plain Aquifer as a critical groundwater resource and the Legislature's earlier opposition to Lava Ridge. Its resolving clauses say transmission projects should show a "clear, measurable, and durable net benefit to Idaho ratepayers" and that property rights, local land use authority and protection of agricultural and rural communities are paramount considerations in siting major transmission. It also backs nuclear, hydro, geothermal and natural gas as the base of Idaho's energy future. It has no force of law, and its subject is transmission. A plan can quote it as a statement of state policy. It cannot cite it as authority that requires anything.
S 1133 (2025) and the APA Act. Signed March 31, 2025 (2025 session law chapter 241), S 1133 rewrote parts of the Agricultural Protection Area Act, Idaho Code Title 67, Chapter 97. Enrollment is voluntary, for at least 20 years. On enrolled land, Idaho Code 67-9710(4) prohibits non-agricultural uses, naming "solar or wind energy structures," unless they are also contributing to agricultural production. Jeff's package described it as a ban on wind and solar on protected lands, which is right for enrolled land only. It does nothing to unenrolled farmland. But a county plan can point to it as a legislative judgment that solar and wind are non-agricultural uses, and can encourage enrollment.
Common mix-ups
- Claim: The siting posture scoring used in the package is a USDA or NRCS method. What the evidence shows: The County Siting Posture Metric is a scoring framework in Jeff's package. It can be a useful way to organize findings. Present it as the county's own analysis, not as a federal standard.
- Claim: Plan policies are binding on applicants by themselves. What the evidence shows: Plans guide. Zoning ordinances and permit conditions bind. The plan's job is to make the binding parts consistent and defensible.
- Claim: A plan amendment needs mailed notice to every landowner. What the evidence shows: 67-6509 requires published notice at least 15 days ahead, public service announcements and notice to service-providing political subdivisions. Counties may do more.
How the amendment gets adopted
Under Idaho Code 67-6509, the planning commission holds at least one public hearing with notice published at least 15 days ahead, sends notice to political subdivisions that provide services in the county (school districts and the local airport manager are named), and makes a recommendation. If it recommends a material change after its hearing, it gives notice of that change and holds another hearing unless the board will hold one. The board may hold its own hearing and adopts the plan by resolution. Anyone may petition for a plan amendment, though the board may set a minimum interval between requests of up to six months. The hearings lesson covers testimony and the record.
In Jeff's case, the county planning commission voted 5 to 0 in February 2026 to recommend against the proposed utilities and energy chapters, calling them heavy-handed and arguing case-by-case permits were enough. His response to the board took on each finding with sources. Whatever the outcome in a given county, the pattern repeats: the commission recommends, the board decides, and the written record built in between is what a court reads later.
Reporting angle
- Request the planning commission's written recommendation and findings on any plan amendment, plus staff reports and every written comment received. They are public records.
- Compare the plan's land use map to the zoning map. Where the plan calls land agricultural and the zoning allows energy facilities, ask which governs and why.
- Ask whether the county has received notice from the PUC under 67-6508(p) about transmission corridors, and whether the plan has the required analysis.
- Ask how many APA applications the county has received and whether it has adopted the APA ordinance the act describes.
- When an official cites HCR 32, ask which clause and whether they mean transmission.
Research angle
- Plan components: Idaho Code 67-6508. Adoption steps: 67-6509.
- Resolution text: HCR 32 (2026).
- APA Act: 67-9704 (the county ordinance) and 67-9710 (limits on non-farm uses); bill history at S 1133 (2025).
- Soil capability data for any parcel: NRCS Web Soil Survey.
Check yourself
1. Which 67-6508 component expressly lists power plant sites and utility transmission corridors?
Component (h) calls for general plans for sewage, drainage, power plant sites, utility transmission corridors, water supply and other facilities.
2. How many days of published notice does 67-6509 require before the commission's hearing on a plan amendment?
Notice of the time, place and a summary of the plan must be published at least 15 days before the hearing, and political subdivisions providing services must get notice at least 15 days ahead too.
3. What is HCR 32 (2026)?
It passed the House on March 16 and the Senate on March 25, 2026, both by voice vote. It is a statement of legislative policy, not a law.
4. Under the Agricultural Protection Area Act as amended by S 1133 (2025), when are solar or wind energy structures allowed on land enrolled in an APA?
Idaho Code 67-9710(4) prohibits non-agricultural uses including solar or wind energy structures on APA land unless they are also contributing to agricultural production.
5. A plan says the county 'supports balanced energy development.' Why is that weak foundation for a strict zoning chapter?
Consistency findings need something to measure against. Policy that names priorities, places and criteria gives the zoning code and the board a standard; vague goals help the applicant.
6. Can a county limit how often people petition for plan amendments?
67-6509(4) lets the governing board set a minimum interval between amendment requests by resolution, and that interval shall not exceed six months.
Terms in this lesson
- Plan component
- One of the subject areas Idaho Code 67-6508 tells a comprehensive plan to address, such as land use, natural resources, agriculture or public utilities.
- Siting priority
- Plan language ranking where a use should go first, second and never, which zoning then turns into districts and standards.
- Concurrent resolution
- A measure adopted by both chambers of the Legislature that states findings or policy but does not have the force of law.
- Agricultural Protection Area (APA)
- Farmland a landowner voluntarily enrolls for at least 20 years under Idaho Code Title 67, Chapter 97, with limits on non-farm uses.
Sources
- Idaho Code 67-6508, Planning duties (plan components) checked 2026-10
- Idaho Code 67-6509, Recommendation and adoption, amendment, and repeal of the plan checked 2026-10
- Idaho Code 67-6511, Zoning ordinance checked 2026-10
- Idaho Legislature, HCR 32 (2026) text checked 2026-10
- Idaho Legislature, HCR 32 (2026) bill status checked 2026-10
- Idaho Legislature, S 1133 (2025) bill status (signed March 31, 2025, ch. 241) checked 2026-10
- Idaho Code 67-9710, Limitations on local regulations (APA Act) checked 2026-10
- Idaho Code 67-9704, Agricultural protection areas (county ordinance requirements) checked 2026-10