  • Name the main sources for AI and data center energy and water figures and what each one counts
  • Explain why per-query energy estimates disagree so widely
  • Separate direct water use at a data center from indirect water use at power plants
  • Scale a per-query figure up to a yearly total and show the arithmetic
  • State an energy or water figure with its source and its assumptions attached, at a meeting, in testimony or online

AI energy numbers come in three grades, and most news coverage and public debate mix them without saying so. Some are measured from meters and utility bills. Some are reported by companies about their own systems, with methods they chose. Many more are modeled by outside researchers who had to guess at things the companies keep private. All three can be useful. Only one of them is a measurement.

The big totals

National and global figures mostly trace back to LBNL and the IEA.

Lawrence Berkeley National Laboratory (LBNL) wrote the December 2024 United States Data Center Energy Usage Report at the request of Congress. It estimates US data centers used about 76 TWh in 2018 (1.9 percent of US electricity) and 176 TWh in 2023 (4.4 percent). For 2028 it gives a range: 325 to 580 TWh, or 6.7 to 12 percent of projected US use. The report says growth in GPU-accelerated servers for AI drove the recent rise. These are modeled from server shipment data, equipment power ratings and assumptions about use and cooling, cross-checked against what is known. They are the best public US estimate. They are still estimates.

The International Energy Agency's 2025 Energy and AI report puts global data center use at about 415 TWh in 2024, roughly 1.5 percent of world electricity, with the US at 45 percent of that, China 25 percent and Europe 15 percent. Its base case reaches about 945 TWh by 2030, with a 2035 range of 700 to 1,700 TWh depending on the scenario. IEA says data centers account for nearly half of US electricity demand growth through 2030, and that accelerated servers, mainly for AI, grow about 30 percent a year in its base case.

SourceWhat it coversKey figureGrade
LBNL 2024All US data centers176 TWh in 2023; 325 to 580 TWh in 2028Modeled from shipments and equipment data
IEA 2025All data centers worldwide415 TWh in 2024; 945 TWh base case 2030Modeled, scenario based
Google, Aug 2025Median Gemini Apps text prompt0.24 Wh, 0.26 mL waterCompany reported, not independently verified
Sam Altman, 2025Average ChatGPT query0.34 Wh, 0.000085 gallons waterCompany statement, no method published
Epoch AI, Feb 2025Typical GPT-4o queryAbout 0.3 Wh, plausible range 0.1 to 4 WhOutside model with stated assumptions
Mistral, Jul 2025400-token Le Chat response1.14 g CO2e, 45 mL waterCompany lifecycle study, peer reviewed by consultants

Notice that the data center totals are about all computing. AI is the fastest growing slice, but neither LBNL nor IEA claims all 176 or 415 TWh is AI. Anyone who says "AI uses 4.4 percent of US electricity" has made a mistake.

Why per-query numbers disagree

For years the common figure was about 3 Wh per ChatGPT query, roughly ten times a Google search. Then in February 2025 Epoch AI worked it out from scratch for GPT-4o and got about 0.3 Wh. Its assumptions were stated: about 100 billion active parameters, 500 output tokens, H100 chips at about 1,500 watts each all in, running at 10 percent of peak. Change those and the answer moves anywhere from about 0.1 to 4 Wh. Feed the model a 10,000-token document and Epoch's estimate rises to about 2.5 Wh. A 100,000-token input, around 40 Wh.

Google published the first detailed company figure in August 2025: 0.24 Wh for its median Gemini text prompt, measured in May 2025. It also gave a narrower number, 0.10 Wh, counting only the active AI chips. The larger figure adds idle machines held ready for traffic spikes, host CPUs and memory, and building overhead at Google's fleet PUE of 1.09. Google says the median prompt's energy dropped 33-fold in a year. Google also notes the figures were not checked by an independent third party.

What moves the number:

  • Model size. Bigger models do more math per word.
  • Answer length. Energy scales roughly with tokens produced. Reasoning models that "think" in long hidden chains produce many more.
  • Input length. Pasting in a long report costs real energy before a word comes back.
  • Utilization. A chip that sits half idle still draws power. How busy the fleet is changes the per-query share.
  • Boundary. Chips only, whole building, or full lifecycle including chip manufacturing.
  • Median versus average. A few huge requests pull an average up; a median ignores them.
  • Images and video. Generating a video clip is a different order of work from a text reply.

Water: two very different numbers

Water is where the confusion gets worst, because two separate quantities share one word.

Direct water is what the data center withdraws and evaporates, mostly in cooling towers or evaporative coolers. Some designs use almost none and run closed loops or air cooling, at the cost of more electricity. Indirect water is what power plants use making the facility's electricity. Thermal plants (coal, gas, nuclear) evaporate a lot; wind and solar almost none.

LBNL's figures, as summarized by the Global Investigative Journalism Network, put 2023 US data center direct water at about 17 billion gallons and indirect water at about 211 billion gallons, roughly 12 times more. Direct use could double or quadruple by 2028.

The per-query water figures diverge even more than energy. Google: 0.26 mL per median prompt. Altman's 0.000085 gallons works out to about 0.32 mL (0.000085 times 3,785 mL per gallon). Mistral, using a lifecycle method that counts much more of the supply chain, reported 45 mL per 400-token response. A frequently repeated figure of a 500 mL bottle per handful of responses is widely attributed to early versions of the UC Riverside paper "Making AI Less Thirsty" (the paper has been revised several times, so check which version says what before you repeat it); the current version's estimates include about 700,000 liters evaporated to train GPT-3 and a 2027 global AI water withdrawal of 4.2 to 6.6 billion cubic meters. Those numbers include indirect water and assumptions about where and when the work ran. Repeat any of them with the boundary attached.

US data center water, 2023 (billion gallons, LBNL) Direct (cooling) 17 Indirect (power plants) 211 Bars drawn to scale. Indirect depends on the grid mix where the power comes from.
The water fight at a zoning hearing is usually about the small bar. The big bar is at the power plant.

Example: scaling a per-query number

The invented city of Larkspur wants to give 2,000 employees an AI assistant. A council member asks what it will do to the city's energy footprint.

Assume 30 prompts per employee per workday and 250 workdays: 2,000 times 30 times 250 is 15,000,000 prompts a year.

At Epoch's 0.3 Wh: 15,000,000 times 0.3 is 4,500,000 Wh, which is 4,500 kWh. That is less than half of one average US home's 10,791 kWh a year.

At a pessimistic 3 Wh (heavy documents, reasoning model): 45,000 kWh, about four homes.

So for Larkspur's own use, the energy is small. The large numbers in this subject come from billions of users and from training, not from one office. Both things can be true, and any honest argument says which scale it is talking about.

Common mix-ups

  • Claim: Every ChatGPT query uses 3 Wh, ten times a Google search. What the evidence shows: That figure came from early outside estimates. Newer estimates and company reports for short text prompts sit around 0.2 to 0.4 Wh, but long inputs, reasoning models and image or video generation can cost far more.
  • Claim: AI is using 4.4 percent of US electricity. What the evidence shows: That is LBNL's figure for all data centers in 2023. AI is the growing part, not all of it.
  • Claim: A data center that uses no cooling water has no water footprint. What the evidence shows: Its electricity still has an indirect water cost, which depends on the grid. Waterless cooling also tends to use more power.
  • Claim: Company per-prompt numbers settle the question. What the evidence shows: They are useful and self-reported, with boundaries the company chose. Google says its figures were not independently verified.

Reporting angle

  • Ask a proposed facility for its expected annual water withdrawal and consumption (they differ), peak summer day use, source (city system, wells, reclaimed water), and cooling design. Ask for it in writing.
  • Check state water rights filings and the city's water service agreement. Both are public records.
  • For energy, ask the utility for the facility's requested capacity and whether it triggers new generation or transmission. The state utility commission docket will have the filings.
  • When a company gives a per-query number, ask: median or average, what boundary, what date, and has anyone outside checked it?
  • The module "Data Centers in Your Community: Power, Water, Land, Money" walks through the local records in more depth.

Research angle

Check yourself

1. LBNL found US data centers used about 176 TWh in 2023. What share of US electricity was that?

2. Google reports 0.24 Wh for a median Gemini text prompt, while its narrower method gives 0.10 Wh. What explains the gap?

3. Which is the biggest reason per-query energy estimates range from about 0.1 Wh to several Wh?

4. LBNL's figures for 2023 put direct cooling water at about 17 billion gallons and indirect water from electricity generation at about 211 billion gallons. What does that tell anyone weighing a data center's water use?

5. Mistral reported 45 mL of water per 400-token response, far above Google's 0.26 mL. What is the fairest reading?

6. If a city's 2,000 staff each send 30 AI prompts a workday at 0.3 Wh each, for 250 workdays, about how much energy is that a year?

Terms in this lesson

Terawatt-hour (TWh)
A billion kilowatt-hours. National electricity use is counted in these.
PUE
Power usage effectiveness. Total facility power divided by power used by the computers. 1.0 would be perfect; Google reports 1.09 fleetwide.
Direct water
Water a data center itself withdraws or evaporates, mostly for cooling.
Indirect water
Water used at power plants to make the electricity the data center buys.
System boundary
The line around what an estimate counts: chips only, the whole building, or the full supply chain including manufacturing.