Lesson 8 of 10 · about 32 minutes
Growth Pays for Growth? Impact Fees, Development Agreements and Who Pays for New Roads
You'll be able to
- Distinguish project improvements, system improvements and existing deficiencies, and explain who pays for each under Idaho law.
- Walk through the Development Impact Fee Act's requirements: advisory committee, capital improvements plan, proportionate share, credits, spending deadlines, refunds and appeals.
- Explain which Idaho governments may adopt impact fees and how highway districts and ITD reach fees through agreements.
- Summarize the federal exaction tests from Nollan, Dolan, Koontz and Sheetz and the Idaho cases that struck down unauthorized fees.
- Read an impact fee CIP and annual report to check whether fees are justified and being spent.
Start here: the short version
- "Growth pays for growth" in Idaho mostly means development impact fees under the Idaho Development Impact Fee Act, Idaho Code Title 67, Chapter 82. Only cities, counties, single countywide highway districts (in practice, the Ada County Highway District), fire districts and ambulance districts can adopt them directly. Other highway districts and ITD reach fees through intergovernmental agreements.
- An impact fee can pay only for a new development's proportionate share of "system improvements" listed in an adopted capital improvements plan. It cannot pay to fix existing deficiencies or for maintenance, must be spent within 8 years (11 with a written reason) or refunded, and comes with credits, refunds and appeal rights.
- ACHD adopted new fees in December 2025, effective March 1, 2026: $5,803 per single-family home in one countywide service area, up from $3,493 set in 2022. Its draft capital plan totaled about $2.26 billion, of which about $1.64 billion was fee-eligible.
- Federal constitutional limits apply too. In Sheetz v. County of El Dorado (2024), the U.S. Supreme Court held that fees set by legislation, such as a county traffic fee schedule, are not exempt from the Nollan and Dolan tests. Idaho courts have also struck down local fees adopted without state authority.
When a subdivision of 400 homes goes in at the edge of town, someone has to pay for the wider arterial, the new signal and the bridge over the canal. The developer usually builds the streets inside the subdivision. The bigger roads that serve everyone are paid by some mix of impact fees, property taxes, state fuel tax money, federal funds and, sometimes, deals negotiated as a condition of a rezone. How that mix is set decides whether new homebuyers, existing taxpayers or future drivers on a congested road carry the cost.
This lesson explains how Idaho's impact fee law works section by section, who can use it, how the Ada County Highway District (ACHD) set its 2026 fees, how development agreements fit, and what the U.S. Supreme Court and Idaho Supreme Court have said about the limits. Facts are current as of October 2026. This is general information, not legal advice; for a specific fee dispute, read the agency's ordinance and talk to a lawyer. For the planning side of subdivisions, see Subdivisions and Impact Fees in the planning and zoning course.
Three ways new development pays for roads
Idaho law separates two kinds of improvements, and the difference drives who pays.
- Project improvements are "site improvements and facilities that are planned and designed to provide service for a particular development project" (Idaho Code 67-8203(22)). Think of the local streets, sidewalks and turn lanes into a subdivision. A government may require a developer to build "reasonable project improvements" (67-8214(1)). The developer pays, and the cost is usually built into lot prices.
- System improvements are "capital improvements to public facilities designed to provide service to a service area" (67-8203(28)): arterials, major intersections, bridges and signals that serve many developments. Impact fees can pay a share of these.
- Negotiated contributions come through development agreements tied to a rezone (67-6511A) or private agreements about building system improvements in exchange for credits (67-8214(2)).
Everything else, including the share of system improvements that fees cannot cover, fixing existing deficiencies and all maintenance, falls to the general road budget: property taxes, the state Highway Distribution Account, federal aid and local option fees, described in Lesson 2.
Before the Act: when fees were ruled illegal taxes
Idaho's impact fee law grew out of court losses by cities. Two Idaho Supreme Court decisions set the frame.
In Brewster v. City of Pocatello, 115 Idaho 502, 768 P.2d 765 (1988), the court struck down a Pocatello "street restoration and maintenance fee" charged to property owners. The court explained that a fee is a charge for a direct public service to a particular consumer, while a tax is a forced contribution by the public at large to meet public needs. Because the street charge gave owners only the general availability of public streets, it was a tax, and the city had no authority to impose it. (The case is summarized in Idaho Attorney General Opinion 89-4 and in a 2016 Kootenai County district court decision.)
In Idaho Building Contractors Ass'n v. City of Coeur d'Alene, 126 Idaho 740, 890 P.2d 326 (1995), the court struck down Coeur d'Alene's impact fee ordinance. As the 2016 Kootenai County decision describes it, the court found the fee was designed to raise revenue for all residents, not only those who paid it, so it was a tax; with no enabling legislation, it was invalid, and once a charge is a tax its reasonableness does not matter. A March 5, 1995 Spokesman-Review piece said the Idaho Supreme Court had decided Coeur d'Alene and Hayden collected $470,494 and $350,000 in impact fees illegally and must return them, and that the 1992 Idaho Development Impact Fee Act, as it then stood, "gave only Ada County the right to charge developers for growth."
The same principle still applies. In a later case, North Idaho Building Contractors Ass'n v. City of Hayden, 158 Idaho 79, 343 P.3d 1086 (2015), the association challenged Hayden's sewer "capitalization fee," and the Idaho Supreme Court held it was an impermissible tax; on remand, the district court in 2016 refused to save the fee by showing it was reasonable. The lesson for road fees: a local charge for growth must fit within a statute, and the Development Impact Fee Act is the main one.
The Idaho Development Impact Fee Act, section by section
Purpose and who may charge fees
The Act's purpose section (67-8202) says it is meant to "Ensure that adequate public facilities are available to serve new growth and development," to make those who benefit from growth pay a proportionate share, to set minimum standards for local fee ordinances, and to prevent duplicate or ad hoc charges. "Public facilities" include "Roads, streets and bridges, including rights-of-way, traffic signals, landscaping and any local components of state or federal highways" (67-8203(24)(c)).
A "governmental entity" that may adopt an impact fee ordinance means cities, counties, "single countywide highway districts, fire protection districts, and ambulance service districts" (67-8203(14)). Idaho has many highway districts (Lesson 6), but most cover part of a county. They are not on the list. They can still benefit from fees through intergovernmental agreements under 67-8204A, which lets jointly affected entities agree "with highway districts, fire districts, ambulance districts, water districts" to collect and spend fees for system improvements, and lets them agree with ITD on spending fees under a developer's agreement.
The limits on a fee
Section 67-8204 lists 25 requirements for every impact fee ordinance. The ones that matter most to residents and builders:
| Rule | Section | What it means in practice |
|---|---|---|
| Proportionate share cap | 67-8204(1) | A fee "shall not exceed a proportionate share of the cost of system improvements," based on actual costs or reasonable estimates |
| Tied to new demand | 67-8204(2) | Improvements "must be attributable to the capacity demands generated by the new development" |
| When collected | 67-8204(3) | No earlier than start of construction or issuance of a building or manufactured home permit, unless agreed otherwise |
| Individual assessment | 67-8204(5) | A developer can ask for a written calculation based on its own studies and data |
| Spending limits | 67-8204(11) | Fees can be spent only on the category (for example, roads) and in or for the service area where collected |
| Fee per service unit | 67-8204(16) | Cannot exceed capital costs divided by projected service units |
| No double payment | 67-8204(19) | The calculation cannot charge the same development twice |
| Mandatory exemptions | 67-8204(20) | Rebuilding after a fire or other catastrophe within two years, remodels and residential additions that add no service units, replacement homes on the same lot, temporary construction trailers, and uses typically accessory to homes (unless they significantly affect capacity) |
| Affordable housing option | 67-8204(10) | An entity may exempt affordable housing if its comprehensive plan supports it and another source covers the cost |
| Incidental benefit allowed | 67-8204(23) | A fee "shall not be deemed invalid because payment of the fee may result in an incidental benefit" to others |
The advisory committee
Before adopting fees, an entity must appoint an advisory committee of at least five members (67-8205). At least two must be active in development, building or real estate. Two must not be employees or officials of a governmental entity. For appointments on or after July 1, 2023, members must live in the service area, government employees acting in their official capacity cannot serve, and a planning commission serving as the committee must include at least two members outside those industries. Those 2023 changes came from Senate Bill 1114, which passed the Senate 34-0-1 and the House 59-9-2 and was signed March 27, 2023 (session law chapter 146). The committee helps adopt land use assumptions, reviews the capital improvements plan, files written comments, and must report at least annually, including on "any perceived inequities."
The capital improvements plan
Fees can pay only for projects in an adopted capital improvements plan (CIP). Under 67-8208, the plan must describe existing facilities and their deficiencies, with cost estimates and "a plan for funding" fixes from other revenue; analyze existing capacity (prepared by a qualified planner or licensed engineer); state land use assumptions; convert land uses into service units (for roads, often trips or vehicle miles of travel); list the system improvements needed for new growth and their costs; project demand over no more than 20 years; list all funding sources; and give a schedule. It must be updated at least every five years and whenever the fee ordinance changes. Where comprehensive planning applies, it becomes part of the comprehensive plan.
Section 67-8207 lists eight factors for the proportionate share, including how existing facilities were paid for, how much new development will pay through taxes and other payments, credits for developer-built improvements, extraordinary costs, a time-and-price adjustment, and other funding sources such as user charges and intergovernmental transfers.
Procedure
Under 67-8206, the CIP is developed with the advisory committee. The entity must hold at least one public hearing before adopting or amending the CIP, with newspaper notice published 15 to 30 days before, and must hold a public hearing on the fee ordinance (the two can be combined). The ordinance cannot be adopted as an emergency, and it "shall not take effect sooner than thirty (30) days following its adoption."
Credits, spending deadlines, refunds and appeals
- Credits (67-8209): A developer gets credit for the present value of system improvements, land or money it was required to provide in the same category, and for tax and user fee revenue it generates that is used for system improvements. Excess contributions can become a credit or a reimbursement from later fees. The entity must sign a written credit agreement before the developer starts building.
- Accounts and deadlines (67-8210): Fees go into interest-bearing accounts by category and service area. They must be spent within 8 years on a first-in, first-out basis (20 years for wastewater and drainage), or up to 11 years if the entity states a reasonable cause and an expected spending date in writing. Otherwise they are refunded.
- Annual report (67-8210): As part of its annual audit, the entity must report fees collected, appropriated or spent by category and service area, and the percentage of tax and other non-fee revenue spent on system improvements. This report is the single best public record for checking whether fees are working.
- Refunds (67-8211): Owners can get refunds when service was never provided, a permit was denied or abandoned, fees were not spent on time, or an assessment shows overpayment. Refunds go to the owner of record within 90 days of the determination, with interest at half the legal rate.
- Appeals (67-8212): Every ordinance must provide an administrative appeal and voluntary mediation (costs split equally). A fee payer can pay under protest to get a permit and still appeal.
- Collection (67-8213): Ordinances may withhold building permits or utility service until fees are paid and allow liens. If an entity finds a formula error that overcharges payers, it must adjust fees case by case or stop collecting until the ordinance is corrected.
Who actually charges road impact fees in Idaho
ACHD: the only countywide highway district
ACHD is a single countywide highway district, the kind the Act names, so it adopts and collects its own road impact fees. (Lesson 1 covers whether any other Idaho district qualifies; this lesson found no other road agency adopting fees directly.) Its impact fee page says the commission approved Ordinance No. 254 on December 3, 2025, effective March 1, 2026, and that a fee payer can apply for an individual assessment in writing within 30 calendar days after payment, or before paying.
The 2025 update was the first substantial review of the CIP's cost estimates since before the pandemic, according to BoiseDev. Highlights from BoiseDev's coverage of the September 2025 proposal and the December 3, 2025 vote:
- The prior fee, set in 2022, was $3,493 per single-family home.
- Staff first proposed splitting the county at Cole Road into two service areas: $8,929 per home in the west and $5,348 in the east. A single countywide area would have averaged about $7,138.
- Corrected figures before the vote were $6,331 west and $4,590 east, or $5,803 for a single service area. Staff said they had removed some non-eligible future project costs in mid-November and found remaining spreadsheet errors after being alerted twice, including about $300,000 in right-of-way costs left in intersection projects and one east-side project counted in the west.
- The commission voted 4-1 for the single service area model. Adopted fees include $5,803 per single-family home, $2,371 per multifamily unit, $7,363 per 1,000 square feet of office and $12,082 per 1,000 square feet of shopping center.
- ACHD also adopted a standard to update its CIP at least every four years, more often than the five-year minimum in 67-8208.
The September 2025 draft CIP showed how much of the planned road network fees could cover. The west area listed $1.78 billion in projects, $1.3 billion of them fee-eligible; the east area $480 million, $339 million fee-eligible. Combined, about $1.64 billion of $2.26 billion (roughly 72 percent) was eligible for impact fees. Even the eligible part is not all paid by fees; the proportionate share calculation credits taxes new development will pay. Check the adopted CIP for final totals, which this lesson did not verify.
One service area or two: both sides
The service area choice is a policy decision with real winners and losers. ACHD's Justin Lucas, as quoted by BoiseDev, said either model could be "justified by sound engineering and planning principles," making the choice a policy decision. BoiseDev reported the arguments:
- For two areas: Some residents and jurisdictions said it was unfair for fees paid in one part of the county to build a distant project. Two areas would have tied west-side fees to the higher cost of west-side roads.
- For one area: ACHD had merged four service areas into one in 2012 after trouble raising enough money in smaller areas and confusion among developers over different fees. A single area gives the district flexibility to spend where the system benefits most.
Cities, counties and other highway districts
Outside Ada County, the road owner is often a highway district that cannot adopt fees on its own. The common answer is an intergovernmental agreement in which a city or county adopts and collects the fee and the highway district spends it. Canyon County's 2025 comprehensive plan amendment (case OR2025-0003) proposed committing the county to such agreements and listing ten impact fee CIPs as appendices, including Canyon Highway District No. 4's Traffic Impact Fee Program and Mid-Star Service Area Capital Improvements Plan, both dated May 7, 2021, with a cost per vehicle-mile of travel of $2,883. Whether that amendment was adopted was not verified for this lesson; check Canyon County's planning records.
ITD and state highways
ITD is not a "governmental entity" under the Act and does not adopt impact fees. Section 67-8214(2) lets developers, owners, ITD and local governments make private agreements about building system improvements, and requires that when a development directly affects a state highway, the agreement allocate collected fees to that facility. KTVB reported that the City of Star and ITD signed a first-of-its-kind intergovernmental agreement under which Star collects development fees from developers within city limits on ITD's behalf for State Highways 44 and 16 and US-20/26, with the money kept in a separate account for Star's state highway projects. Star's mayor said ITD "does not have a mechanism in place right now to collect impact fees because that's not allowed by the state." The KTVB story did not show a date in the text reviewed; confirm the agreement's date and current status with the city.
Development agreements
Idaho's Local Land Use Planning Act lets a city or county, by ordinance, "require or permit as a condition of rezoning" that an owner or developer make a written commitment about how the land will be used or developed (67-6511A). These development agreements often include road items: building a collector street, dedicating right-of-way, paying for a signal, or phasing homes to road capacity. The commitment must be recorded, binds later owners, and can be modified only after notice and a hearing. If the developer fails to comply, the board can terminate the commitment and reverse the zoning after notice and a hearing.
Development agreements give both sides flexibility, but they are negotiated case by case, which is exactly what the Impact Fee Act's purpose section warns against ("ad hoc" requirements). Residents should read the agreement attached to any rezone. Road commitments in a development agreement are only as good as the enforcement that follows. See Conditional Uses and Variances for how conditions attach to land use approvals.
Exactions and the Constitution
When a government conditions a permit on giving up land or money, the U.S. Constitution's Takings Clause applies. Four Supreme Court cases set the rules.
| Case | Holding in plain words |
|---|---|
| Nollan v. California Coastal Comm'n, 483 U.S. 825 (1987) | A permit condition must have an "essential nexus" to a legitimate government interest the permit affects. |
| Dolan v. City of Tigard, 512 U.S. 374 (1994) | The condition must be roughly proportional, in nature and extent, to the project's impact. |
| Koontz v. St. Johns River Water Mgmt. Dist., 570 U.S. 595 (2013) | Decided 5-4 on June 25, 2013. The tests apply "even when the government denies the permit," and they apply to demands for money, not only land (Justia). |
| Sheetz v. County of El Dorado, 601 U.S. 267 (2024) | Decided unanimously on April 12, 2024. The Takings Clause does not distinguish between legislative and administrative permit conditions, so a $23,420 traffic impact fee set by a county's general plan schedule was not exempt from Nollan and Dolan (Cornell LII). |
Sheetz left open whether a fee applied to a whole class of properties must be tailored as specifically as one set for a single project. Justice Kavanaugh, joined by Justices Kagan and Jackson, wrote that the ruling does not bar impact fees set by reasonable formulas or schedules that assess classes of development. On remand, the California Court of Appeal applied Nollan and Dolan and upheld the fee for single-family homes, but the California Supreme Court ordered that opinion depublished on November 12, 2025, according to the county's brief. Mr. Sheetz petitioned the U.S. Supreme Court again (No. 25-958), and the Court denied review on June 15, 2026 (docket).
For Idaho, the Act's own requirements (proportionate share, CIP, service units, credits) are designed to meet the same tests. Sheetz means a fee schedule must still be defensible as roughly proportional when challenged. Builders and property rights groups read Sheetz as a needed check on fees that can add thousands of dollars to a home's price. Local governments and planners read the Kavanaugh concurrence as confirming that formula-based fee schedules remain lawful when properly supported.
An Idaho case on voluntary road payments: Buckskin Properties v. Valley County
Buckskin Properties, Inc. v. Valley County, 154 Idaho 486, 300 P.3d 18 (2013) (Idaho Supreme Court docket 38830; record listing at the University of Idaho law library), involved The Meadows development near Donnelly. As the Idaho Business Review reported, the developers had signed agreements with Valley County to pay a "proportionate" amount toward road improvements. They paid $1,844 per lot in the first three phases; for the fourth phase the amount rose to $3,968 per lot. The developer sought a refund of about $247,000 for the second and third phases, arguing the payments were illegal impact fees.
The unanimous court, in an opinion by Justice Jim Jones issued March 29, 2013, held that developers who voluntarily agree to pay do not receive all the protections of the Development Impact Fee Act. Because the county had not required the agreement, the developer could not later challenge the payments; if the county had required it, the developer could have asked a court to decide the proportionate amount. The district court had also dismissed the suit as filed too late. The practical lesson: a road payment in a negotiated agreement may be hard to challenge later, so developers, and the local officials who negotiate with them, should be clear about whether a payment is required or volunteered. The full opinion was not loaded for this lesson; read it on the court's site or a case law database before quoting it.
Urban renewal and roads
Urban renewal districts can also pay for roads. Tax increment financing captures the growth in property tax value inside a district and can pay for public infrastructure, including streets, that supports development there. That money comes from taxes that would otherwise flow to all taxing districts, including the highway district. Whether that is a sensible investment or a diversion is a recurring local debate. See Urban Renewal and Economic Development for how districts work and how to read their plans.
When growth outruns the fees
Impact fees cover less than many residents assume, for structural reasons built into the law:
- No fees for existing problems. The CIP must identify existing deficiencies and plan to fund them from other revenue (67-8208). A road already congested before a subdivision arrives must be fixed with taxes, not fees.
- Capital only. "Capital improvements" have a useful life of ten years or more (67-8203(3)). Plowing, patching, striping and signal power are never fee-eligible.
- Credits reduce fees. New homes also pay property taxes and fuel taxes that help fund roads, and 67-8207 and 67-8209 require credits for that.
- Timing lag. Fees arrive at the building permit. Roads often must be built before or during growth, so agencies borrow, wait or build later.
- ITD cannot charge fees. State highways often carry the heaviest growth traffic, but ITD is not a "governmental entity" under the Act and can only reach fees through agreements with cities or counties (67-8204A, 67-8214(2)). With the one-time $275 million fiscal 2026 General Fund transfer not repeated for fiscal 2027 and about $1.3 billion in highway projects moved to "unfunded" in the July 2026 draft plan (Lesson 5), that gap is wider.
- Property tax limits. Local road agencies can generally raise their property tax budgets by only 3 percent a year plus new construction and forgone amounts (Idaho Code 63-802). ACHD's FY2027 budget took all available increases, including forgone balance (Lesson 6).
The policy argument
Home builders and real estate groups argue higher impact fees raise home prices and rents, fall on first-time buyers, and that roads serve everyone and should be paid broadly. Many existing residents and some local officials argue the reverse: without higher fees, current taxpayers subsidize growth they did not choose, and congestion is the hidden price. Planners often point to a middle path: fees set at the defensible proportionate share, plus broader taxes or state funding for the rest. The Act asks each entity to plan for "alternative revenue sources" (67-8207(2)(h)), so the question "what pays for the share fees cannot cover?" should have a written answer in every CIP.
Example: Building a road impact fee from the CIP (invented numbers)
The city of Riverbend and its highway district are invented. Their joint CIP lists $90 million in arterial and intersection projects over 20 years. Engineers find $20 million of that fixes congestion that already exists; that part must come from other revenue. The remaining $70 million adds capacity for growth.
The land use assumptions project 50,000 new daily vehicle trips from new development. The gross cost per trip is $70,000,000 / 50,000 = $1,400. A credit for future property and fuel taxes that new development will pay toward these same projects is calculated at $300 per trip, leaving $1,100 per trip. If a single-family home generates about 9.4 daily trips in the city's study, the fee is roughly 9.4 x $1,100 = $10,340. A builder who dedicates right-of-way worth $50,000 for one of the listed arterials would receive a credit for that amount. If fees collected in a given year are not spent within 8 years, they must be refunded unless the city documents a reason and an expected spending date within 11 years. The trip rate here is invented for illustration; real studies use local counts and national trip generation data.
How to: Read an impact fee capital improvements plan
- Find the CIP. For ACHD, use its impact fee page. For cities and counties, look in the comprehensive plan appendices or ask the planning department.
- Check the date. If it is more than five years old, ask why it has not been updated as 67-8208 requires.
- Find the land use assumptions: how many homes and jobs are projected, and over what period (no more than 20 years).
- Find the list of existing deficiencies and the plan to fund them with other money. If that list is missing, ask for it.
- Find the project list and costs. Compare project costs to recent bids for similar work (Lesson 10).
- Find the service unit (trips, vehicle miles, or similar) and the fee per unit. Check the math: total eligible cost divided by projected units.
- Find the credits. Look for the tax credit calculation and how developer-built improvements are credited.
- Read the advisory committee's written comments and annual report. They must note "any perceived inequities."
How to: Check whether impact fees are being spent
- Request the annual impact fee report required by 67-8210 for the last three years. It must show fees collected, appropriated and spent by category and service area.
- Request the account balance by year of collection. Fees must be spent first-in, first-out within 8 years, or 11 with a written reason.
- Ask for any written findings extending the 8-year deadline and the expected spending date.
- Compare spending to the CIP project list. Fees spent on projects not in the CIP, or outside the service area, are red flags.
- Ask whether any refunds were paid under 67-8211 and how many fee appeals or individual assessments were filed under 67-8212.
- Use a public records request if the report is not online. See Idaho Public Records Requests.
How to: Weigh in on a fee update
- Watch for the published notice of the CIP hearing, 15 to 30 days ahead (67-8206). Ask to be mailed notice.
- Request the land use assumptions and draft CIP; the notice must say they are available.
- Attend advisory committee meetings, which are public under the open meetings law. See Idaho Open Meetings.
- Comment in writing on specific items: a project you think does not belong, a cost that looks high, a service area boundary, or a credit.
- Testify at the ordinance hearing. See Testifying and Public Comment.
Myth: "Impact fees pay for all the roads that growth needs."
By law they cannot. Fees may pay only the proportionate share of capacity projects in an adopted CIP, after credits. They cannot fix existing deficiencies or pay for maintenance, and ITD cannot collect them for state highways on its own. In ACHD's 2025 draft CIP, about 28 percent of planned project costs were not fee-eligible at all, before any credits. The rest of the cost falls on property taxes, state and federal money, or delay.
Myth: "A city can charge any fee it wants on new homes as long as it calls it a fee."
Idaho courts have repeatedly struck down local charges that function as taxes without legislative authority, including Pocatello's street fee (1988), Coeur d'Alene's impact fee (1995) and Hayden's sewer capitalization fee. A road charge on new development needs a statute, which for most local governments means following the Development Impact Fee Act step by step.
Reporting angle
- Request your city's, county's or ACHD's last three annual impact fee reports and compare collections to spending. Look for balances approaching the 8-year deadline.
- Ask ACHD how much it collected in the first months under Ordinance 254 compared with projections, and how many individual assessments and appeals were filed.
- For a highway district that is not countywide, ask whether it has impact fee agreements with cities or the county, when they were signed and what CIP they use.
- Pull the development agreement for a large recent rezone and list its road commitments. Check whether each one has been met.
- Ask ITD whether it has agreements like Star's with other cities, and how much has been collected and spent under them.
- After Sheetz, ask local attorneys whether any Idaho fee schedules have been revised or challenged.
Research angle
- Idaho Code Title 67, Chapter 82: the full Development Impact Fee Act.
- Idaho Code 67-6511A: development agreements.
- ACHD impact fees: ordinance, CIP and assessment process.
- ACHD 2025 CIP update engagement page: draft documents and public comments.
- Sheetz v. County of El Dorado and Koontz: the federal exaction rules.
- Buckskin Properties v. Valley County briefs: the Idaho record.
- S1114 (2023): the advisory committee amendments.
Where this fits in the rest of the course
Impact fees are one revenue source among those mapped in Lesson 2. The property tax limits that push agencies toward fees are in Lesson 6, and the state's unfunded projects in Lesson 5. Federal funds are in Lesson 7. Lesson 9 shows how to press for a specific project and Lesson 10 how to report on one. Background on ownership is in Lesson 1.
Related courses: Idaho Planning and Zoning (especially Subdivisions and Impact Fees), Urban Renewal and Economic Development, Idaho Property Taxes, the 3 percent cap, levies and bonds, Running for Local Office, and Budgets and Fiscal Duty for elected officials.
Check yourself
1. Which of these can adopt a development impact fee ordinance directly under Idaho Code 67-8203(14)?
The definition lists cities, counties, single countywide highway districts, fire protection districts and ambulance service districts. Other highway districts and ITD rely on agreements.
2. How long does a governmental entity generally have to spend impact fees before they must be refunded?
Idaho Code 67-8210 requires spending within 8 years, first-in first-out, extendable to 11 years with a written reasonable cause and expected spending date. The 20-year limit applies to wastewater and drainage.
3. What single-family impact fee did ACHD adopt in December 2025, effective March 1, 2026?
The commission voted 4-1 for a single service area at $5,803 per single-family home. $3,493 was the 2022 fee; $7,138 and $8,929 were September 2025 draft figures.
4. What did the U.S. Supreme Court hold in Sheetz v. County of El Dorado (2024)?
The unanimous Court held the Takings Clause does not distinguish legislative from administrative permit conditions, so a legislatively set traffic fee is subject to Nollan and Dolan.
5. Why can't impact fees fix a road that was already congested before new development arrived?
Idaho Code 67-8204(2) ties fees to capacity demands of new development, and 67-8208 requires the CIP to identify existing deficiencies and plan to fund them from other sources.
Terms in this lesson
- Development impact fee
- A payment required as a condition of development approval to pay a proportionate share of the cost of system improvements (Idaho Code 67-8203(9)).
- System improvements
- Capital improvements that serve a service area, such as arterials, signals and bridges; eligible for impact fees.
- Project improvements
- Site improvements that serve a particular development, such as internal streets; built by the developer and not eligible for fee credit.
- The part of system improvement costs reasonably attributable to new development, set using the factors in Idaho Code 67-8207.
- Capital improvements plan (CIP)
- The adopted plan listing fee-eligible projects, costs, land use assumptions and schedule; updated at least every five years.
- Service area
- The geographic area where fees are collected and must be spent.
- Credit
- A reduction in fees for land, improvements or money a developer provided, or taxes new development pays toward the same improvements (Idaho Code 67-8209).
- Development agreement
- A recorded written commitment by an owner or developer made as a condition of rezoning under Idaho Code 67-6511A.
- Exaction
- A condition on a land use permit requiring land or money; subject to the Nollan and Dolan tests.
- Rough proportionality
- The Dolan requirement that a permit condition be related in nature and extent to the project's impact.
Sources
- Idaho Code Title 67, Chapter 82: Idaho Development Impact Fee Act checked 2026-10
- Idaho Code 67-8204: Minimum standards for impact fee ordinances checked 2026-10
- Idaho Code 67-6511A: Development agreements checked 2026-10
- Idaho Legislature: S1114 (2023), Development Impact Fees checked 2026-10
- ACHD Impact Fees checked 2026-10
- BoiseDev: ACHD considers big impact fee increases (Sept. 2025) checked 2026-10
- BoiseDev: ACHD raises impact fees; caught errors (Dec. 2025) checked 2026-10
- Sheetz v. County of El Dorado (Cornell LII) checked 2026-10
- Koontz v. St. Johns River Water Management District, 570 U.S. 595 (Justia) checked 2026-10
- U.S. Supreme Court docket 25-958 (Sheetz) checked 2026-10
- North Idaho Building Contractors v. City of Hayden, Kootenai County district court decision (2016) checked 2026-10
- Idaho Business Review: Buckskin Properties v. Valley County checked 2026-10
- Canyon County OR2025-0003 comprehensive plan amendment (impact fee CIPs) checked 2026-10
- KTVB: City of Star partners with ITD on development fees checked 2026-10