Lesson 6 of 10 · about 22 minutes
The Snake River Basin Adjudication and Looking Up Rights
You'll be able to
- Explain what an adjudication decides and why Idaho ran one for the Snake River Basin
- Describe the steps from notice of claim to director's report, objections, partial decree and final decree
- Name the six general adjudications IDWR lists and say which are still moving
- Find a water right record on IDWR's website and read its main elements
- Tell the difference between a decreed right, a licensed right, a permit and a claim
A river is an old piece of paper trail. Rights were claimed on county records, on court decrees from the early 1900s, on state licenses, and on nothing but a ditch that had been used for sixty years. If a senior user makes a call, the watermaster has to know who is senior. If a town wants to know whether water is available for a new subdivision, someone has to add up what is already spoken for. An adjudication is the way a state clears that up.
What an adjudication is
Idaho Code 42-1401A defines a "general adjudication" as an action for the judicial determination of the extent and priority of the rights of all persons to use water from a water system, conclusive as to the nature of all rights in that system, with stated exceptions, and for the administration of those rights. IDWR's plain version: a water right adjudication is a court proceeding that inventories and catalogs water rights at a snapshot in time, and the court issues a decree confirming the elements of each water right.
The word "all" matters. A general adjudication covers local, state and federal governments, tribes, businesses and private owners together. It also covers both surface water and ground water in the system. The statute defines "water system" to include rivers, streams, lakes, springs and ground waters. Federal law is the reason Idaho does it this way: the McCarran Amendment, 43 U.S.C. 666, which the Kootenai statute (42-1406D) cites, lets states join the United States in a basin-wide adjudication of a river system.
The Snake River Basin Adjudication, in dates
| When | What happened | Source |
|---|---|---|
| November 19, 1987 | The SRBA is commenced. Idaho Code 42-1425 refers to this as the date of commencement of the Snake River Basin Adjudication. | Idaho Code 42-1425 |
| 1987 to 2014 | Claimants file notices of claim; IDWR examines claims and files director's reports in parts; objections are heard; partial decrees are entered. | IDWR; 42-1409 to 42-1412 |
| August 25, 2014 | The Final Unified Decree is signed, according to IDWR's SRBA page. News reports of the time described a judge signing it on a Monday that week. | IDWR; Boise State Public Radio |
| After 2014 | Deferred small domestic and stock claims may still be brought by motion. Supplemental adjudications, for rights that arise later, are authorized by 42-1424. | IDWR; 42-1401A(10) |
Boise State Public Radio reported at the time that it took 27 years, nearly three times the roughly ten years originally expected, and that the latest cost estimate was $94 million against a 1980s estimate of $27 million, with water-user fees meant to cover part of the cost and the general fund covering the rest. The same report said Idaho had defined more than 158,000 water rights. These are news figures from 2014, not statute numbers. Check IDWR's progress reports and the SRBA court record if a story depends on an exact count.
How a right gets decreed
- Commencement. A district court enters an order commencing the adjudication (42-1407). The director then prepares a plain-language notice of the order for service on water users (42-1408).
- Notice of claim. The claimant describes the right on a standard form (42-1409): source, quantity, priority date, any record number or court decree, point of diversion, purposes and periods of use, and place of use. For irrigation, the form asks for irrigated acres in each forty-acre subdivision. It also asks for dates of changes or enlargements and conditions on the right. Claimants swear or affirm that the information is accurate.
- Examination. IDWR examines the water system, the canals and ditches, and the uses being made (42-1410).
- Director's report. IDWR recommends each right's elements (42-1411). If an old license or decree leaves out an element, 42-1427 has the director recommend it based on the extent of beneficial use as of the date the adjudication began, so long as the claimant is not exceeding a previously determined element.
- Objections. A claimant who disagrees with a right or a general provision files an objection with the court within the time in the notice (42-1412). The court orders a settlement conference before trial, may request more investigation from the director, and conducts the trial without a jury. The court can appoint special masters to help (42-1422).
- Decrees and appeal. The court enters partial decrees for individual rights and, when the whole system is done, a final decree. An appeal can be taken to the Idaho Supreme Court (42-1418). Once final, the decree is conclusive as to the nature and extent of all rights in the adjudicated system, with exceptions in 42-1420 such as domestic and stock rights excluded by court order and pending permits and applications.
The consequence of not filing
IDWR's adjudication page is blunt: if an adjudication claim is required for your water use and you do not file before the final decree, the result is a determination that the water right no longer exists. That is why notices were mailed repeatedly and why claim deadlines get so much attention in newspapers and county meetings. The exceptions, again, include small domestic and stock water rights, which may be deferred, though the opportunity to defer is not indefinite.
What is still being adjudicated
IDWR says six general stream adjudications cover almost the entire state. Four are in northern Idaho and one is in the southeast. Their status, from IDWR's pages checked in October 2026:
| Adjudication | Where | Status noted by IDWR |
|---|---|---|
| Snake River Basin (SRBA) | Snake River drainage | Final Unified Decree signed August 25, 2014. Deferred small domestic and stock claims proceed by motion. |
| Palouse River Basin (PRBA) | Palouse River basin, Administrative Basin 87 | Commencement order March 1, 2017. Late claims go directly to the Idaho Water Adjudications court. |
| Coeur d'Alene-Spokane River Basin (CSRBA) | Northern Idaho | Late claims still accepted. A late claims director's report was filed May 28, 2026, with objections due July 31, 2026 and responses due September 29, 2026. |
| Clark Fork-Pend Oreille River Basin (CFPRBA) | Portions of Boundary, Bonner and Kootenai counties | Commencement order June 15, 2021. Late claims accepted and late fees required in Basin 97. |
| Bear River Basin (BRBA) | Portions of Bannock, Bear Lake, Caribou, Cassia, Franklin, Oneida and Power counties | Commencement order June 15, 2021. Second-round service notices were mailed in 2025 for Administrative Basins 11 and 13. |
| Kootenai River Basin (KRBA) | Kootenai River basin | Authorized by 42-1406D effective July 1, 2024. Petition filed January 3, 2025. Commencement order March 6, 2026. IDWR's page lists June 4, 2027 as the deadline to file a notice of claim. |
Dates may have moved by the time you read this. IDWR posts a monthly adjudication progress report. The page you want is the one for your basin, which also holds the claim forms and the schedule of meetings.
Looking up a water right: step by step
IDWR keeps the water right records. Its Water Right and Adjudication Search page is the starting point. The page describes a map-based water right search, an address-based Irrigation Rights Finder, and search tools for new applications, pending transfers and new enlargement claims. IDWR changes its site design from time to time, so the exact menu words may differ from this list. The steps below describe what to look for rather than a button label.
- Start with the property. Gather the address or the legal description (township, range, section) of the land. An old deed, a county assessor page or the parcel viewer will give the section.
- Open IDWR's Water Right and Adjudication Search page. Pick the map-based search for a location search, or the Irrigation Rights Finder if you have an address and want to know which irrigation district or rights serve it.
- Zoom to the parcel. Look for points of diversion (where water leaves a stream, ditch or well) and places of use (the land where it is used). A right can have its point of diversion far from its place of use.
- Select a right and open its record. The record lists the water right number and the details below. Save or print it with the date.
- Check the status and the documents. The record and its linked documents show whether the right is decreed, licensed, a permit or a claim, and what court or order it came from.
- Look for changes. Search for pending transfers or applications on the same source. A transfer (lesson 04) can change the point of diversion or place of use.
- Call the regional office with what you saw. If the record does not match the ground, say so. IDWR staff can explain why.
Reading a record
The elements below come from the list in 42-1409 that a notice of claim must contain and that 42-1427 describes as the standard elements of a decreed or licensed right. A decree or report in any basin should show most of them.
| Element | What it tells you | What to check |
|---|---|---|
| Water right number | Basin number, sequence number, sometimes a suffix (example from IDWR: 95-1234A) | Use the full number in any request or story |
| Owner or claimant | Who holds the right | Ownership changes are filed separately; the record may lag |
| Source | The stream, spring or aquifer | Tributary relationships can matter in administration |
| Priority date | The date that sets the right's place in line | Earlier date means more senior |
| Quantity | Diversion rate, usually in cubic feet per second, and often an annual volume in acre-feet | Compare the rate to the acres irrigated |
| Point of diversion | Legal description of where water is taken | Does it match the real headgate or well? |
| Purpose and period of use | Irrigation, stock, domestic and so on, with season dates | Watering outside the season is outside the right |
| Place of use | The land where the water is used, with irrigated acres in each forty-acre subdivision | Land not listed is not covered |
| Changes and enlargements | Dates of any changes and the size of the diversion works | Look for approved transfers |
| Conditions and remarks | Limits on exercising the right and notes needed for administration | Easy to miss and often decisive |
Decreed, licensed, permit, claim
- Decreed: a court has determined the elements of the right, in an adjudication or an older court decree.
- Licensed: a permit was issued, the water was put to beneficial use, and the state issued a license after proof. Licensed rights are reviewed in adjudications too.
- Permit: permission to develop a right. Under 42-1420(1)(b) and (c), a pending application for permit or an issued permit is not lost by failure to file a notice of claim, unless the director required a claim.
- Claim: an assertion in an adjudication that has not yet been decreed.
Worked example: reading an invented record
Sam and Mira Delacroix are buying the invented Quillfeather Farm. The seller says the 80 acres come with "a full irrigation right." The record from IDWR's search shows an invented right, number 99-0000A, source Quillfeather Creek, priority date June 1, 1912, rate 1.6 cubic feet per second, place of use 80 acres, season April 1 to October 31.
Rate check. 1.6 cfs / 80 acres = 0.02 cfs per acre. 0.02 cfs per acre (one cubic foot per second for every 50 acres) is a rate often used as a rough Idaho irrigation benchmark, so this right looks ordinary on its face. The benchmark is a rule of thumb for comparison only; the record's own rate and conditions control.
Volume check. One cfs running for a day is about 1.9835 acre-feet. If the right ran at its full rate for the season of April 1 to October 31, which is 214 days, the most it could deliver at that rate is 1.6 x 214 x 1.9835, which is about 679 acre-feet, or roughly 8.5 acre-feet per acre. A right with a volume limit lower than that would cap the total; the record's volume line controls. In dry years the creek will not carry 1.6 cfs, so the priority date matters: a 1912 date is senior to most Idaho rights, though the water actually delivered depends on what is in the creek that week.
What the Delacroixes should ask. Does the place of use list all 80 acres, or only 60? Is there a pending transfer on the same right? Does the point of diversion match the headgate they saw? Those are questions for the IDWR regional office, the watermaster if there is one, and the seller. The record gives them numbers to ask about.
Common mix-ups
- Claim: "The SRBA gave everyone a new right." What the evidence shows: It confirmed existing rights as of a date. It did not create water. IDWR calls it a snapshot in time.
- Claim: "The adjudication is over everywhere." What the evidence shows: The SRBA is over, but IDWR lists five other general adjudications, and several are active or accepting late claims.
- Claim: "If I did not file, I lose my house well." What the evidence shows: Small domestic and stock rights may be deferred, though the deferral is not unlimited and IDWR recommends filing. In the SRBA a deferred claimant now files a motion.
- Claim: "The record I printed is the final word." What the evidence shows: Records change with transfers and ownership updates. Print the date, and confirm with the regional office before a purchase.
- Claim: "A decree guarantees I will get my water." What the evidence shows: A decree states the right. Delivery depends on supply and priority in the system.
Reporting angle
- Pull the monthly adjudication progress report for the basin you cover. It shows claim counts, deadlines and service rounds. Compare month to month.
- Request from IDWR (Idaho Code 74-101 and following) the list of water rights in a named source, with priority dates, so a story about a dry year can state who is senior.
- Check the court record. The Idaho Water Adjudications court holds objections, special master reports and orders. Late claims in the CSRBA and PRBA go directly to that court, not to IDWR.
- Questions for officials: How many deferred domestic and stock claims remain in the basin? What will the filing deadline be? Who pays for the next round of service notices?
- Numbers to check: total claims, total rights decreed, cost, years. The 2014 news figures (more than 158,000 rights, $94 million, 27 years) should be tied to a source and a date.
- Where to ask: the IDWR regional office for your county; the adjudication contacts listed on the IDWR adjudication page.
Research angle
- IDWR Water Rights Adjudication. FAQs, forms, a status map and monthly reports.
- IDWR SRBA page. Final decree date and the deferred domestic and stock process.
- Idaho Code Title 42, Chapter 14. The adjudication statute, section by section.
- IDAPA 37.03.01, Adjudication Rules. Procedures, forms and fee rules.
- IDWR Water Right and Adjudication Search. The search tools described above.
- IDWR KRBA page. The newest basin and the statute that started it.
Related lessons in this course: 05 on domestic wells and 07 on the Eastern Snake Plain Aquifer. Other courses: Water, Land and Agriculture and Public Records Requests in Idaho.
Questions and answers
Why did the SRBA take 27 years?
The 2014 news report said the project took nearly three times its original ten-year estimate. The scale was large: a basin-wide inventory of more than 158,000 rights, with objections, special masters and appeals. The statute shows the steps, and each one takes time.
Is a right in the SRBA decree permanent?
The decree is conclusive as to the nature and extent of rights at that date. A right can still be changed through the transfer process, lost by forfeiture, or administered according to priority. Lesson 03 and lesson 04 cover those.
Where do I find the final decree?
IDWR's SRBA page says the decree is available at srba.idaho.gov. Use the link on IDWR's page.
My well was drilled in 1990. Is it in the record?
If it is a domestic well that stayed within the exemption, it may be deferred or may appear only in well drilling records. Search the well construction records and the water right search separately.
What does a priority date of 1912 mean?
It is the date that sets the right's place in line among rights on the same source. Earlier is senior. It does not, by itself, tell you how much water arrives.
Can I object to someone else's claim?
In an adjudication, a claimant who wants to object to a water right or a general provision in the director's report files an objection with the court within the time in the notice (42-1412). Another party may file a response stating its position. The timing is set by the notice for that basin.
I live in the Palouse or Bear River area. What do I do?
Start with the IDWR page for your basin. For the PRBA and CSRBA, late claims go to the Idaho Water Adjudications court with a motion. For the BRBA and CFPRBA, check the current filing instructions and fee schedule on the IDWR page.
Does the adjudication add a tax on wells?
IDWR's FAQ says the Idaho Legislature would need to pass new legislation to impose a tax on private wells, and that the adjudication does not itself require meters on private domestic wells. It describes funding as filing fees plus the general fund, at an estimated ratio of about one-tenth fees and nine-tenths general fund dollars.
Hard questions
"Why should I pay a claim fee to prove a right I have always used?"
The fee is set in statute and IDWR's fee schedule, and IDWR says the funding mix is about one-tenth fees and nine-tenths general fund. The state's reason for requiring claims is that a decree is conclusive and the system cannot confirm rights it has not been told about. The cost to the claimant is real, and so is the cost of losing the right by not filing.
"Did the SRBA treat tribes and the federal government fairly?"
That is a question with a long record. The statute allows a negotiated agreement between a federal reserved water right claimant and the state to be incorporated into a decree (42-1401). Read the actual agreements and decree provisions in the court record for a specific claimant. This lesson did not review them, and nothing here is a view on any party's claim.
"If a decree is conclusive, why do water fights continue?"
A decree fixes the elements of rights. It does not decide how much water is in the river this year or how aquifer pumping affects a spring. Those questions go to administration, the subject of lessons 02 and 07.
"The record on the website is wrong about my place of use. Who fixes it?"
The path depends on the cause. A clerical error is raised with the IDWR regional office. A disputed element in an active adjudication goes through the objection process. A real change in use goes through the transfer process under 42-222. Ask the regional office which one applies.
Check yourself
1. What does a general adjudication do?
Idaho Code 42-1401A defines a general adjudication as an action for the judicial determination of the extent and priority of the rights of all persons to use water from a water system, conclusive as to the nature of all rights in it, with stated exceptions.
2. Which court conducts Idaho's general water right adjudications under the Supreme Court's choice?
IDWR states that the Idaho Supreme Court chose the 5th Judicial District court in Twin Falls to conduct the adjudication, with IDWR acting as technical expert.
3. A rancher in the Snake River basin deferred filing a claim for a small stock water right years ago. What must the rancher do now to receive a decreed right?
IDWR's SRBA page says users who deferred small domestic or stock claims must now file that motion to receive a decreed water right.
4. In the order of a general adjudication, which step comes first?
After the court orders the adjudication commenced, claimants file notices of claim (42-1409), the director examines the system and claims (42-1410), files a report (42-1411), then objections are heard (42-1412) and decrees follow.
5. A water right number on an IDWR record reads 95-1234A. What does the first part, 95, stand for?
IDWR explains that a water right number has a basin number, a sequence number and sometimes a suffix, using 95-1234A as its example.
6. Which of these is a water right in a Snake River basin record that is described as 'licensed'?
The permit and license system under chapter 2 of Title 42 ends with a license after proof of beneficial use. A claim is an assertion, a decree is the court's determination, and a permit is permission to develop.
Terms in this lesson
- General adjudication
- A court action to determine the nature, extent and priority of all water rights in a water system, conclusive as to those rights, as defined in Idaho Code 42-1401A.
- Notice of claim
- The form a claimant files to assert a water right in an adjudication, describing source, quantity, priority date, point of diversion, use and place of use (42-1409).
- Director's report
- The report IDWR files in an adjudication recommending the elements of each water right (42-1411).
- Partial decree
- A decree for an individual water right that the court enters before the final decree for the whole system.
- Final unified decree
- The single decree that collects all partial decrees in an adjudicated basin. The SRBA's was signed in August 2014.
- Water right number
- A basin number, a sequence number and sometimes a suffix that identify a right in IDWR records, such as 95-1234A.
Sources
- IDWR, Water Rights Adjudication checked 2026-10
- IDWR, Snake River Basin Adjudication (SRBA) checked 2026-10
- IDWR, Bear River Basin Adjudication (BRBA) checked 2026-10
- IDWR, Clark Fork-Pend Oreille River Basin Adjudication (CFPRBA) checked 2026-10
- IDWR, Coeur d'Alene-Spokane River Basin Adjudication (CSRBA) checked 2026-10
- IDWR, Palouse River Basin Adjudication (PRBA) checked 2026-10
- IDWR, Kootenai River Basin Adjudication (KRBA) checked 2026-10
- Idaho Code Title 42, Chapter 14, Adjudication of Water Rights (42-1401A, 42-1409 to 42-1412, 42-1418, 42-1420, 42-1427) checked 2026-10
- Idaho Code 42-1406D, Kootenai River water rights adjudication, commencement checked 2026-10
- Boise State Public Radio, Why it took 27 years and $94 million to complete Idaho's water rights adjudication (Aug. 29, 2014) checked 2026-10
- IDWR, Water Right and Adjudication Search checked 2026-10