VideoMilner Evidence Short 2: Bid as a Battery, Swapped for GasSeries: South Hills - Milner Project · Part 4Vertical short, 1:30. The documents behind Milner Gas Power Plant video 2, on screen: the 60 megawatt Milner battery bid, the request for updated pricing that brought back gas engines of up to 222 megawatts, and PUC staff comments and Commission orders on competitive bidding. Narrated by Laurel, an ElevenLabs voice.Download videoVideoMilner Evidence Short 1: Only a Building PermitSeries: South Hills - Milner Project · Part 3Vertical short, 1:28. The documents behind Milner Gas Power Plant video 1, on screen: Idaho Power's own testimony that, at this time, a conditional use permit is not required in Twin Falls County, only a building permit, and its project page on noise with no decibel figure. Narrated by Laurel, an ElevenLabs voice.Download videoVideoMilner Gas Power Plant 10 of 10: The Deadlines You Can Still MakeSeries: South Hills - Milner Project · Part 26Vertical video, 1:52. The state comment period on the Milner gas plant closed July 31, but the calendar isn't empty: the Dec. 9 Silver Spur pipeline session in Twin Falls, Dec. 14 deadlines for pipeline comments and for public comments in the large-load cost case, FERC docket P-2899-157 at any time, the coming DEQ air permit, and 21 days to ask for reconsideration after a final order. Twin Falls County: 208-736-4068. PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.Download videoVideoMilner Gas Power Plant 9 of 10: Twelve Stacks, No Emissions NumbersSeries: South Hills - Milner Project · Part 25Vertical video, 2:17. Idaho Power's Milner gas plant, filed as South Hills, has twelve engines and twelve exhaust stacks in its rendering, and no emissions numbers on its project page. As of Nov. 19, 2026, no air permit application for the plant appears on DEQ's public comment page, and Idaho's air rules bar construction without a permit to construct, with a few exceptions. Watch DEQ's page for "South Hills" or "Idaho Power Company"; a written request opens a comment period. Narrated by Laurel, an ElevenLabs voice.Download videoVideoMilner Gas Power Plant 8 of 10: Agencies Got 60 Days. Neighbors Weren't on the List.Series: South Hills - Milner Project · Part 24Vertical video, 2:32. On June 24, 2026, Idaho Power emailed a draft federal filing about its Milner plant site to nine people at eight organizations, including federal agencies, Idaho Fish and Game, Twin Falls Canal Company, two tribes and the State Historical Society, and gave them 60 days to comment. The filing asks to pull about a tenth of an acre out of the Milner hydro project boundary for the plant's fenced yard. Neighbors weren't on the list. Anyone can comment on FERC docket P-2899-157. Narrated by Laurel, an ElevenLabs voice.Download videoVideoMilner Gas Power Plant 7 of 10: Money Down on Engines Before the State RuledSeries: South Hills - Milner Project · Part 23Vertical video, 2:34. Idaho Power's reply says a payment for the reciprocating engines for its Milner gas plant was made in June 2026, with the state case still open. It also wants customers charged construction interest back to December 2025. PUC staff wants interest to start only after an approval order, with a hard cap on what customers pay. From the free-market side, a company that bets early should carry that bet. Idaho PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.Download videoVideoMilner Gas Power Plant 6 of 10: Solar on Potato Cellars Needed a Hearing. The Gas Plant Hasn't Had One.Series: South Hills - Milner Project · Part 22Vertical video, 3:13. The gas plant at Milner, filed as South Hills, has had no public hearing on the record at the PUC or the county. The PUC set the case for a decision on written comments, and as of Nov. 19, 2026, no ruling had been posted on a July request for public hearings. Meanwhile about 110 kilowatts of solar on potato cellars near Hansen needed a conditional use permit and a hearing. Twin Falls County: 208-736-4068. PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.Download videoVideoMilner Gas Power Plant 5 of 10: A New Gas Pipeline, and Eminent Domain if ApprovedSeries: South Hills - Milner Project · Part 21Vertical video, 2:45. The Silver Spur pipeline would run about 88 miles of 24-inch pipe from Elko County, Nevada, into Twin Falls County, and approval brings the right of eminent domain. Natural Gas Intelligence reported Idaho Power signed for 175,000 dekatherms a day of its roughly 275,000, and Idaho Power's testimony ties pipeline capacity to its new plants. FERC public session Wednesday, Dec. 9, 5 to 8 p.m., Magic Valley High School, 512 Main Avenue North, Twin Falls; comments by Dec. 14 on docket PF26-15. Narrated by Laurel, an ElevenLabs voice.Download videoVideoMilner Gas Power Plant 4 of 10: Largest Customers Drive 88% of the GrowthSeries: South Hills - Milner Project · Part 20Vertical video, 2:54. Idaho Power says its new gas plant at Milner serves Magic Valley customers. PUC staff found its largest-customer class grows from 258 to 875 average megawatts between 2026 and 2030, 88 percent of all growth on the system, with Micron's new chip plant alone adding about 445. The conservative principle is cost causation: customers who drive the need should pay for it. Idaho PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.Download videoVideoMilner Gas Power Plant 3 of 10: The Name Missing From the State's NoticesSeries: South Hills - Milner Project · Part 19Vertical video, 2:33. The Public Utilities Commission's two formal notices on Idaho Power's gas plant at Milner Dam never use the word Milner or name Twin Falls County; the plant is filed as South Hills, a name Idaho Power testified it chose to prevent internal confusion with its Milner hydro plant. The South Hills are the mountains south of Twin Falls, while the site sits on the valley floor. Search both names; the state case is IPC-E-26-04. Narrated by Laurel, an ElevenLabs voice.Download videoVideoMilner Gas Power Plant 2 of 10: Bid as a Battery, Swapped for GasSeries: South Hills - Milner Project · Part 18Vertical video, 3:31. What competitive bidding is and why it matters, then what happened at Milner. Idaho Power's own bid team entered a 60 megawatt battery; after it made the shortlist, the bid came back as a gas plant of up to 222 megawatts. PUC staff says the company effectively bypassed the RFP selection process, and Idaho Power calls that incorrect. Staff still recommends approval, with a hard cap on costs. Idaho PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.Download videoVideoMilner Gas Power Plant 1 of 10: Up to 222 Megawatts. Idaho Power Says the County Requires Only a Building Permit.Series: South Hills - Milner Project · Part 17Vertical video, 2:39. Idaho Power plans a natural gas plant of up to 222 megawatts on a pivot field just downstream from Milner Dam, now filed as South Hills: twelve engines in two engine halls on a 20-acre parcel. The project page promises noise-reduction measures and gives no decibel figure, and Idaho Power testified the county requires only a building permit. Twin Falls County commissioners: 208-736-4068. Narrated by Laurel, an ElevenLabs voice.Download videoVideoYour Seat at the TableVertical video, 1:22. BAAJA, the Senate permitting bill, narrows federal environmental review under NEPA and ties the right to go to court to whether a person commented first, with 150 days to file. Why public hearings and written comments matter more under the bill, how Idaho's senators voted, and who to call. Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.Download videoVideoSmith, Reagan, Eisenhower: The Conservative Case Against SubsidiesVertical video, 2:09. Adam Smith on merchants who meet and end up scheming against the public, and Ronald Reagan's line on the government habit of taxing, regulating and then subsidizing. Since 2020 a qualifying Idaho data center has paid no sales tax on servers and new buildings, with no end date, while Georgia's own state audit estimated 70 percent of its data centers would have come without its break. How much is Idaho giving up? Narrated by Laurel, an ElevenLabs voice.Download videoVideoPublic Land for Mine WasteVertical video, 0:54. BAAJA Section 2215 would let mining claim holders set up 5-acre mill sites on federal land for waste rock and tailings, whether or not the land holds minerals, as many as are "reasonably necessary," for $400 a site each year. Who decides how much of Idaho's public land goes to mine waste? Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.Download videoVideoPermitted Today, Locked In TomorrowVertical video, 1:32. BAAJA Title IV would make a valid federal permit much harder to take back. If an agency pulls one and can't justify it in court, the company can collect fees and delay costs, plus 25 to 50 percent of its development and construction costs if the agency acted in bad faith. Section 1402 allows 50 to 100 percent of a project's expected construction cost, paid from the federal Judgment Fund with no new vote by Congress. Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.Download videoVideoHow Data Centers Became a Test of PatriotismVertical video, 2:29. People who ask hard questions about data centers are told they're helping China; the House speaker called the opposition a Chinese psyop. Yet a Fox News poll found 70 percent of voters oppose a data center near them, and on Nov. 3, 2026, voters favored limits in 40 of 41 local ballot measures. Edmund Burke's "little platoon" and the conservative case that asking where the bill lands and where the water goes is how free people govern themselves. Narrated by Laurel, an ElevenLabs voice.Download videoVideoMake Data Centers Pay Their WayVertical video, 1:09. The one part of BAAJA worth keeping. Section 2107 says data centers should bear the full cost of the electric service and lines they need. FERC would have 90 days to start rewriting transmission pricing, and on retail bills no part of the added cost of serving a new data center could be put on any other customer. Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.Download videoVideoIdaho's Water, Washington's ClockVertical video, 1:01. Under Clean Water Act Section 401, Idaho reviews federal permits for projects that could pollute its rivers and streams. BAAJA Section 1202 would require clear and convincing evidence for a denial, cap the review at one year (nine months for interstate power lines and gas pipelines), and treat a missed deadline as a waiver. Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.Download videoVideoIdaho Energy Rush: Who Decides on Public Land?Video, 6:04, widescreen. Solar, battery and data center proposals headed for BLM land in southern Idaho. The Snake River Energy solar farm grew from 400 megawatts on about 4,600 acres to up to 1,000 megawatts of solar plus batteries on about 6,150 acres. The BLM will study it in one review with Rhea Data's campus south of Boise, and Copia's Falcon data center sits near the Midpoint substation. County zoning covers private land, so on federal ground counties can only take part as cooperating agencies. Ends with a free-market view. Narrated by Laurel, an ElevenLabs voice.Download videoVideoFewer Chances to Be HeardVertical video, 1:26. BAAJA keeps the laws that give citizens a voice and cuts the openings. Program-wide reviews would last 10 years instead of 5, agencies could borrow each other's lists of projects that skip review, grid and pipeline work in existing corridors would skip environmental and historic review, and wetland permit challenges would need a prior comment and a 150-day filing. Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.Download videoVideoBAAJA and Your LandVertical video, 1:47. A Facebook post claims the Senate wants to let companies take private land for data centers. The bill tells a narrower story: Section 2101 would let federal regulators permit interstate power lines of 230 kilovolts or more almost anywhere, with eminent domain for permit holders who can't reach a deal with a landowner. The American Farm Bureau's warning, Idaho's limited siting role, and how Sens. Crapo and Risch voted. Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.Download videoVideoWhere Idaho's Data Centers Really AreVertical video, 2:17. What is on the public record as of Nov. 13, 2026. One hyperscale data center is running, Meta's near Boise. Rhea Data and Copia want federal land. TerraVolt holds land options near Declo but hasn't filed with Cassia County. Mountain Home passed a moratorium a week after plans were dropped off, and Pocatello said no and the developer went to court. Boise, Mountain Home, Elmore, Bannock and Blaine now have moratoriums. Narrated by Laurel, an ElevenLabs voice.Download videoVideoSolar for the ServersVideo, 4:46, widescreen. In January 2025 the BLM took public input on Arevia Power's Taurus Wind and Snake River Energy solar projects in three south central Idaho counties. BLM officials now tie that solar farm to Rhea Data's proposed data center south of Boise, and Copia is in early talks with the BLM on a second data center near the Midpoint Substation. Also covers what counties can decide on federal land, Executive Order 14318 and when public comment opens. Includes a labeled free-market opinion segment. Narrated by Laurel, an ElevenLabs voice. Revision 3.Download videoVideoThe SMRs Worth WatchingVertical video, 2:19. Four test reactors went critical by July 4, 2026, three of them at Idaho National Laboratory. Then Crusoe and Aalo announced a small data center at INL powered by an Aalo reactor, aiming for 2027. A company that pays for its own reactor, fuel, safety and cleanup keeps its power bill off everyone else's. The open questions: who pays if it stalls, and where the used fuel ends up. Narrated by Laurel, an ElevenLabs voice.Download videoVideoHow to Read a Developer's SEC Filings in Five MinutesVertical video, 2:27. When a publicly traded developer promises a county jobs and a cleanup bond, its SEC reports are free on sec.gov. Search the 10-Q for "going concern." TerraVolt's June 2026 report says there is substantial doubt about its ability to continue as a going concern, its filings name no customer, and its Declo land is under option, not owned. A rezone can outlive the company that asked for it. Narrated by Laurel, an ElevenLabs voice.Download videoVideoOff the Grid, Off the Hook?Vertical video, 2:19. TerraVolt wants a data center near Declo that makes its own power: 240 megawatts of natural gas behind the meter. Idaho's new ratepayer protection law, H.B. 911, works through a contract between a utility and its big customer, so a plant that never buys from the grid has no contract to test. The company's SEC filings warn of substantial doubt about staying in business and name no data center customer. Questions for Cassia County: who is the customer, who pays to tear it down, and who pays if it ever ties to the grid. Narrated by Laurel, an ElevenLabs voice.Download videoVideoMeta's Idaho Data Center, By the NumbersVertical video, 2:36. Meta's data center near Boise is Idaho's only confirmed hyperscale data center, and the numbers keep moving: announced in 2022 at $800 million, online in 2026 at $1.2 billion, and a water system that grew from $50 million to more than $100 million, all company figures. Its power use is confidential, and the state hasn't said what the sales tax exemption has saved Meta. A third amendment to its power contract is before the PUC in case IPC-E-26-25, with comments due Dec. 9. Narrated by Laurel, an ElevenLabs voice.Download videoVideoHow a Data Center Moratorium WorksVertical video, 2:42. Since July 2026, Elmore County, Bannock County, Blaine County, Mountain Home and Boise have paused data centers. A moratorium is a temporary stop while a city or county writes permanent rules, and Idaho law limits an emergency moratorium to 182 days. If no permanent rules pass, the old rules may apply again. How to watch the planning and zoning schedule, read the draft and comment in writing. Narrated by Laurel, an ElevenLabs voice.Download videoVideoFrom Server Rooms to National StrategyVideo, 2:49. How data centers went from company server rooms to a national strategy: electricity use from 58 TWh in 2014 to 176 TWh in 2023, the 2025 Stargate announcement, Executive Orders 14179 and 14318, and the AI Action Plan. Then the 2026 claims that local opposition is a China influence campaign, set against polling of Trump voters. Ends with a free-market view: a project that is good business should pay its own way, and neighbors should get a real say. Narrated by Laurel, an ElevenLabs voice. Revision 2.Download videoVideoDecide First, Explain LaterVertical video, 2:23. On July 24, 2026, Gov. Brad Little signed a preliminary memorandum with the Energy Department on a nuclear campus, putting Idaho among five contenders. The memorandum, obtained by the Idaho Capital Sun, says any future host agreement shall provide for the acceptance of out-of-state used nuclear fuel, to be recycled for newer reactors. That runs into the 1995 Settlement Agreement, and the public saw the terms after the signature. Former Chief Justice Jim Jones has asked for public hearings. Narrated by Laurel, an ElevenLabs voice.Download videoVideoBrownfields FirstVertical video, 2:07. Good farm ground takes generations to build, while old industrial sites already have roads, power lines and industrial zoning. Executive Order 14318 tells the EPA to identify brownfield and Superfund sites for large data centers but doesn't require developers to use them. The position here: farmland should never be rezoned for hyperscale projects, and used ground comes first. Pocatello's two denials at the old Hoku site show used ground still needs the homework. Narrated by Laurel, an ElevenLabs voice.Download videoDocumentFeeding the Beast Brief, Nov. 19, 2026PDF, 3.2 MB · Vol. I, No. 5.DocumentFeeding the Beast Brief, Nov. 17, 2026 (rev. 3)PDF, 4 MB · Vol. I, No. 4.VideoDeclo - Plans to Make PlansSeries: Delco Idaho Data Center Campus · Part 16Clip 16 of 16. A Twin Falls resident asks what training programs exist so the permanent jobs go to locals. TerraVolt says it intends to work with trade schools and colleges in southern Idaho. The exchange ends with one line: "There are plans to make plans, but currently there are no plans."Download videoVideoDeclo - Who DecidesSeries: Delco Idaho Data Center Campus · Part 15Clip 15 of 16. Asked whether Idaho or the county has data center rules, TerraVolt says the county has none yet and "The state does not regulate land use. The county regulates land use."Download videoVideoDeclo - What Are They SellingSeries: Delco Idaho Data Center Campus · Part 14Clip 14 of 16. Asked what would draw a data center company to the site, TerraVolt says, "So an entitled piece of property would be the key," meaning county approvals in hand, followed by power, cooling and connectivity.Download videoVideoDeclo - What Comes Out of the StacksSeries: Delco Idaho Data Center Campus · Part 13Clip 13 of 16. A resident asks what emission limits TerraVolt would accept on its natural gas generators and asks for independent air modeling and baseline monitors. TerraVolt says Idaho DEQ sets the limits after county approval and the plant would need a Tier I permit with continuous emissions monitoring on the stacks.Download videoVideoDeclo - Why They Left CaliforniaSeries: Delco Idaho Data Center Campus · Part 12Clip 12 of 16. TerraVolt explains why its Imperial Valley project in California ended: permit delays, Berkshire Hathaway pulling out on power, and county approvals tied up in the Lithium Valley plan. It calls Idaho "a much more business friendly state."Download videoVideoDeclo - Who Pays for the Fire TrucksSeries: Delco Idaho Data Center Campus · Part 11Clip 11 of 16. A resident asks who pays to get local fire and EMS crews ready for a fire at an industrial power and data campus. TerraVolt describes on-site water tanks, sprinklers and staff and says "there would have to be some funding for the fire department," but won't say yet what it would commit to.Download videoVideoDeclo - Water In, Wastewater OutSeries: Delco Idaho Data Center Campus · Part 10Clip 10 of 16. TerraVolt says that since July 1, 2026, Idaho Code 42-252 bars new data centers from using water for cooling unless it comes from a municipal system, and this site isn't on one. It says the land carries 1,500 acre-feet of water rights and wastewater would be treated on site.Download videoVideoDeclo - Have You Built OneSeries: Delco Idaho Data Center Campus · Part 9Clip 9 of 16. A resident asks whether TerraVolt has ever completed a data center it planned and why the company changed its name from CalEthos. She asks that a 50 acre-foot water cap and a ban on cooling towers be written into the county permit.Download videoVideoDeclo - The Hum You Can't BlockSeries: Delco Idaho Data Center Campus · Part 8Clip 8 of 16. A resident says data center noise is low frequency and carries for miles, whatever the decibel reading at the gate. TerraVolt answers, "We can look into it. I am not aware of low frequency sound."Download videoVideoDeclo - Is This Even AllowedSeries: Delco Idaho Data Center Campus · Part 7Clip 7 of 16. A Burley resident asks whether a data center is allowed on the property now. TerraVolt says no. It would take an amendment to the county's multiple-use designation, and no application has been filed.Download videoVideoDeclo - No Customer YetSeries: Delco Idaho Data Center Campus · Part 6Clip 6 of 16. TerraVolt says it has not approached any customers and wants county approval first, naming Microsoft, Google or Meta as the kind of buyer it has in mind. Asked what happens if no customer signs, it says, "If we don't contract the customer, we don't build the project."Download videoInfographicHow Opposing Data Centers Got Framed as a China IssueStatements and actions in date order, June to September 2026InfographicFrom Server Rooms to National Strategy: The Evolution of U.S. Data CentersU.S. data center electricity use, the four kinds of data centers and the 2025 federal timelineSlidesFrom Server Rooms to National Strategy (Slides)PDF, 1.8 MB · 10-slide deck, PDF. The slides behind the From Server Rooms to National Strategy video: the four kinds of data centers, U.S. data center electricity use from 2014 to a 2028 projection, the 2025 federal strategy, the June to September 2026 rhetoric about opponents, the Economist/YouGov poll and a free-market view. Each slide lists its source.